Wage Determination FL20260212-16536-bld

Manatee, FL · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260212-16536-bld covers 27 trade classifications for building construction in Manatee, FL. Total packages (base + fringe) range from $13.71/hr to $90.27/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260212-16536-bld
Revision: 1
Type: building
County: Manatee
State: FL
Effective: May 17, 2026
Trades covered: 27
Highest rate: $90.27/hr
Official source: SAM.gov reference FL20260212View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.12 $13.11 $43.23 $0.00 $0.00 $0.00 $0.00
CARPENTER $19.78 $8.05 $27.83 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.85 $0.60 $15.45 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.11 $14.59 $47.70 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.37 $12.65 $39.02 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.25 $17.32 $52.57 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING $13.11 $0.60 $13.71 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $1.40 $15.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.07 $8.80 $30.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.00 $1.40 $15.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.72 $2.13 $16.85 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $51.83 $38.44 $90.27 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $21.93 $7.96 $29.89 $0.00 $0.00 $0.00 $0.00
PLUMBER $21.14 $8.11 $29.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $35.01 $16.85 $51.86 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.82 6.78 ROOFER $19.00 $1.17 $20.17 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.01 $0.00 $18.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.22 $2.12 $15.34 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 $0.00 $0.00 $0.00 $0.00
View all WDs for Manatee → Revision history →