Wage Determination FL20260071-16536-res
Manatee, FL · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination FL20260071-16536-res covers 38 trade classifications for residential construction in Manatee, FL. Total packages (base + fringe) range from $9.00/hr to $55.86/hr, with the highest going to POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90%. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: FL20260071-16536-res
Revision: 1
Type: residential
County: Manatee
State: FL
Effective: May 17, 2026
Trades covered: 38
Highest rate: $55.86/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES CABINET INSTALLATION | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.36 | $0.00 | $13.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $13.15 | $0.00 | $13.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $9.50 | $0.22 | $9.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $10.00 | $0.00 | $10.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | $15.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $35.25 | $17.32 | $52.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.00 | $1.07 | $10.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.33 | $0.00 | $10.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $11.33 | $0.00 | $11.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PAVER | $12.40 | $0.00 | $12.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.30 | $0.00 | $14.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.50 | $2.00 | $17.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $12.17 | $0.00 | $12.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $14.81 | $0.00 | $14.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY | $13.09 | $0.00 | $13.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $11.25 | $0.00 | $11.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION | $13.15 | $0.00 | $13.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% | $39.01 | $16.85 | $55.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS | $15.65 | $0.00 | $15.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION | $9.85 | $0.38 | $10.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $15.63 | $3.00 | $18.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY | $10.63 | $0.00 | $10.63 | $0.00 | $0.00 | $0.00 | $0.00 |