Wage Determination FL20260064-16533-res

Hernando, FL · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260064-16533-res covers 42 trade classifications for residential construction in Hernando, FL. Total packages (base + fringe) range from $9.00/hr to $55.86/hr, with the highest going to POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90%. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260064-16533-res
Revision: 1
Type: residential
County: Hernando
State: FL
Effective: May 17, 2026
Trades covered: 42
Highest rate: $55.86/hr
Official source: SAM.gov reference FL20260064View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $12.97 $1.97 $14.94 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $18.27 $0.00 $18.27 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.98 $0.00 $11.98 $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $14.00 $0.75 $14.75 $0.00 $0.00 $0.00 $0.00
GLAZIER $15.88 $0.00 $15.88 $0.00 $0.00 $0.00 $0.00
INSULATOR: BATT AND BLOWN $12.41 $0.00 $12.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.25 $0.00 $15.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $35.25 $17.32 $52.57 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $14.53 $0.00 $14.53 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.25 $0.00 $9.25 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $10.72 $0.00 $10.72 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.29 $0.00 $11.29 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.14 $0.00 $15.14 $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $12.40 $0.00 $12.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.25 $0.00 $15.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.67 $0.00 $12.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.62 $0.00 $10.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $14.81 $0.00 $14.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 $0.00 $0.00 $0.00 $0.00
PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY $13.59 $0.00 $13.59 $0.00 $0.00 $0.00 $0.00
PLASTERER $13.91 $0.00 $13.91 $0.00 $0.00 $0.00 $0.00
PLUMBER $12.97 $0.00 $12.97 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $15.98 $0.00 $15.98 $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION $14.82 $0.00 $14.82 $0.00 $0.00 $0.00 $0.00
TILE SETTER $16.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.22 $0.00 $10.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 $0.00 $0.00 $0.00 $0.00
View all WDs for Hernando → Revision history →