OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANEs across all covered states and counties. Rates vary by location and construction type.
Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE is $56.48/hr, with the middle 80% of counties paying between $56.48 and $56.48/hr. The highest state average is Michigan at $56.48/hr; the lowest is Michigan at $56.48/hr.
Range: $56.48 – $56.48/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
16 county-level rates for OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Bay | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Berrien | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Calhoun | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Cass | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Clinton | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Eaton | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Genesee | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Ingham | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Jackson | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Kalamazoo | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Lapeer | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Livingston | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Newaygo | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Ottawa | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Saginaw | MI | building | $31.23 | $25.25 | $56.48 | WD → |
| Van Buren | MI | building | $31.23 | $25.25 | $56.48 | WD → |