Wage Determination MI20260097-15483-bld

Saginaw, MI · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260097-15483-bld covers 41 trade classifications for building construction in Saginaw, MI. Total packages (base + fringe) range from $12.00/hr to $80.24/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260097-15483-bld
Revision: 1
Type: building
County: Saginaw
State: MI
Effective: May 17, 2026
Trades covered: 41
Highest rate: $80.24/hr
Official source: SAM.gov reference MI20260097View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH $47.28 $25.25 $72.53 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER IS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY $35.14 $24.20 $59.34 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.86 $23.69 $59.55 $0.00 $0.00 $0.00 $0.00
CARPENTER $16.50 $1.65 $18.15 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.50 $25.03 $64.53 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.25 $15.00 $45.25 $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: VINYL FLOORING $16.81 $3.73 $20.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER $27.68 $13.45 $41.13 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDST $29.93 $9.10 $39.03 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TEN $27.71 $9.10 $36.81 $0.00 $0.00 $0.00 $0.00
LABORER: SANDBLASTER $28.21 $13.45 $41.66 $0.00 $0.00 $0.00 $0.00
LATHER $24.29 $13.66 $37.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.31 $13.84 $32.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.50 $8.67 $26.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.62 $0.00 $17.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $43.93 $25.25 $69.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.10 $8.48 $27.58 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $29.23 $19.11 $48.34 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $30.22 $22.22 $52.44 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $22.02 $6.02 $28.04 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $46.00 $22.99 $68.99 $0.00 $0.00 $0.00 $0.00
PLASTERER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER IS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY $33.01 $24.54 $57.55 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $46.00 $22.99 $68.99 $0.00 $0.00 $0.00 $0.00
ROOFER $30.38 $19.87 $50.25 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.83 $23.78 $50.61 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER IS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLI $26.24 $21.13 $47.37 $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER IS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDA $31.43 $21.13 $52.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 $0.00 $0.00 $0.00 $0.00
View all WDs for Saginaw → Revision history →