Wage Determination MI20260089-15463-bld

Lapeer, MI · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260089-15463-bld covers 42 trade classifications for building construction in Lapeer, MI. Total packages (base + fringe) range from $14.75/hr to $103.89/hr, with the highest going to CREDIT. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260089-15463-bld
Revision: 2
Type: building
County: Lapeer
State: MI
Effective: May 17, 2026
Trades covered: 42
Highest rate: $103.89/hr
Official source: SAM.gov reference MI20260089View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH $47.28 $25.25 $72.53 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDA $38.00 $26.49 $64.49 $0.00 $0.00 $0.00 $0.00
CARPENTER $36.46 $23.69 $60.15 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.86 $23.69 $59.55 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.77 $12.88 $40.65 $0.00 $0.00 $0.00 $0.00
CREDIT $65.45 $38.44 $103.89 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER: DRYWALL SANDING $33.54 $18.03 $51.57 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER: HAND WORK $27.15 $15.00 $42.15 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER: MACHINE WORK $27.15 $15.00 $42.15 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.83 $26.96 $71.79 $0.00 $0.00 $0.00 $0.00
GLAZIER $37.41 $18.99 $56.40 $0.00 $0.00 $0.00 $0.00
INSTALLER - OVERHEAD DOOR $27.98 $0.00 $27.98 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $39.08 $15.92 $55.00 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER $29.46 $16.10 $45.56 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER $29.93 $9.10 $39.03 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE $27.71 $9.10 $36.81 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $43.93 $25.25 $69.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLER $32.58 $18.12 $50.70 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $23.79 $12.02 $35.81 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $23.79 $12.02 $35.81 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.01 $17.29 $48.30 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $46.61 $22.95 $69.56 $0.00 $0.00 $0.00 $0.00
PLASTERER $30.63 $14.07 $44.70 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $46.61 $22.95 $69.56 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER $42.74 $21.53 $64.27 $0.00 $0.00 $0.00 $0.00
ROOFER $30.38 $19.97 $50.35 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOL $28.21 $20.88 $49.09 $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLID $33.31 $23.20 $56.51 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 $0.00 $0.00 $0.00 $0.00
View all WDs for Lapeer → Revision history →