Wage Determination MI20260082-15492-bld

Eaton, MI · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260082-15492-bld covers 44 trade classifications for building construction in Eaton, MI. Total packages (base + fringe) range from $10.88/hr to $82.05/hr, with the highest going to MILLWRIGHT. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260082-15492-bld
Revision: 1
Type: building
County: Eaton
State: MI
Effective: May 17, 2026
Trades covered: 44
Highest rate: $82.05/hr
Official source: SAM.gov reference MI20260082View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH $47.28 $25.25 $72.53 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE $36.10 $26.22 $62.32 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO AND TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WOR $32.20 $20.74 $52.94 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: TERRAZZO AND TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKI $32.20 $23.46 $55.66 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION $28.29 $21.42 $49.71 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION $36.21 $21.06 $57.27 $0.00 $0.00 $0.00 $0.00
CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING $28.29 $21.42 $49.71 $0.00 $0.00 $0.00 $0.00
CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING $36.21 $21.06 $57.27 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.64 $12.88 $37.52 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING $34.30 $22.16 $56.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING $30.43 $10.92 $41.35 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING $34.30 $22.16 $56.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING $42.98 $29.75 $72.73 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 $0.00 $0.00 $0.00 $0.00
LABORER $32.53 $13.45 $45.98 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.38 $0.50 $10.88 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $16.75 $4.75 $21.50 $0.00 $0.00 $0.00 $0.00
METAL BUILDING ERECTOR $16.92 $6.32 $23.24 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.94 $8.72 $30.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.73 $7.02 $26.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $22.00 $6.29 $28.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.75 $9.98 $29.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O $43.93 $25.25 $69.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.10 $8.48 $27.58 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY AND PAPERHANGING $28.75 $18.68 $47.43 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $28.75 $18.68 $47.43 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WOR $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 $42.74 $21.53 $64.27 $0.00 $0.00 $0.00 $0.00
ROOFER $15.00 $0.58 $15.58 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.00 $7.26 $23.26 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.50 $0.44 $14.94 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 $0.00 $0.00 $0.00 $0.00