1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$41.28 |
$25.25 |
$66.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CH
|
$47.28 |
$25.25 |
$72.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR
|
$40.00 |
$23.65 |
$63.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$43.50 |
$36.74 |
$80.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN
|
$40.71 |
$28.21 |
$68.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDA
|
$36.10 |
$26.22 |
$62.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING
|
$36.21 |
$21.06 |
$57.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING
|
$36.76 |
$21.11 |
$57.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING
|
$42.44 |
$31.43 |
$73.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING
|
$36.21 |
$21.06 |
$57.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$25.58 |
$12.88 |
$38.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$24.64 |
$12.88 |
$37.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$32.23 |
$22.11 |
$54.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CREDIT
|
$65.45 |
$38.44 |
$103.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS
|
$28.14 |
$8.89 |
$37.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING
|
$38.79 |
$19.87 |
$58.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING
|
$31.20 |
$10.97 |
$42.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN: LOW VOLTAGE WIRING & ALARM INSTALLATION
|
$36.89 |
$14.16 |
$51.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS W
|
$42.00 |
$25.55 |
$67.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
INSTALLER - OVERHEAD DOOR
|
$27.98 |
$0.00 |
$27.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER STRUCTURAL
|
$30.02 |
$27.43 |
$57.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER, ORNAMENTAL
|
$18.48 |
$7.93 |
$26.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: REINFORCING
|
$36.55 |
$33.37 |
$69.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: STRUCTURAL
|
$36.55 |
$35.93 |
$72.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: ASBESTOS ABATEMENT
|
$39.08 |
$15.92 |
$55.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: COMMON OR GENERAL
|
$17.64 |
$4.95 |
$22.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER
|
$38.11 |
$15.45 |
$53.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (EAST OF OAK GROVE RD. & NORTH OF M-59)
|
$38.00 |
$18.25 |
$56.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER
|
$29.93 |
$9.10 |
$39.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE
|
$27.71 |
$9.10 |
$36.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE
|
$38.33 |
$15.45 |
$53.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: PIPELAYER
|
$38.47 |
$15.45 |
$53.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$42.92 |
$39.13 |
$82.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O
|
$43.93 |
$25.25 |
$69.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5
|
$39.57 |
$25.25 |
$64.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE
|
$39.57 |
$25.25 |
$64.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE
|
$33.71 |
$25.25 |
$58.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE
|
$31.23 |
$25.25 |
$56.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH AND ROLLER
|
$32.85 |
$20.41 |
$53.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH, ROLLER AND SPRAY
|
$28.75 |
$18.68 |
$47.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: DRYWALL FINISHING/TAPING
|
$32.85 |
$20.41 |
$53.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: DRYWALL FINISHING/TAPING
|
$28.32 |
$16.88 |
$45.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY
|
$26.86 |
$17.66 |
$44.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION
|
$51.30 |
$25.87 |
$77.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION
|
$40.30 |
$38.80 |
$79.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY
|
$46.29 |
$25.43 |
$71.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER
|
$25.39 |
$12.53 |
$37.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER
|
$23.73 |
$12.88 |
$36.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER
|
$30.63 |
$14.07 |
$44.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION
|
$43.34 |
$32.92 |
$76.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION
|
$51.30 |
$25.87 |
$77.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, I
|
$46.29 |
$25.43 |
$71.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER
|
$42.74 |
$21.53 |
$64.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1
|
$42.74 |
$21.53 |
$64.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$42.67 |
$21.62 |
$64.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER
|
$41.34 |
$27.39 |
$68.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WIT
|
$33.50 |
$23.52 |
$57.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOL
|
$33.50 |
$23.52 |
$57.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHI
|
$40.53 |
$23.62 |
$64.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLID
|
$40.53 |
$23.62 |
$64.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: TRACTOR HAUL TRUCK
|
$13.57 |
$1.18 |
$14.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |