OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATEs across all covered states and counties. Rates vary by location and construction type.
Across 16 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE is $58.96/hr, with the middle 80% of counties paying between $58.62 and $58.96/hr. The highest state average is Michigan at $58.85/hr; the lowest is Michigan at $58.85/hr.
Range: $58.62 – $58.96/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
16 county-level rates for OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Bay | MI | building | $33.37 | $25.25 | $58.62 | WD → |
| Berrien | MI | building | $33.37 | $25.25 | $58.62 | WD → |
| Calhoun | MI | building | $33.37 | $25.25 | $58.62 | WD → |
| Cass | MI | building | $33.37 | $25.25 | $58.62 | WD → |
| Clinton | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Eaton | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Genesee | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Ingham | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Jackson | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Kalamazoo | MI | building | $33.37 | $25.25 | $58.62 | WD → |
| Lapeer | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Livingston | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Newaygo | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Ottawa | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Saginaw | MI | building | $33.71 | $25.25 | $58.96 | WD → |
| Van Buren | MI | building | $33.71 | $25.25 | $58.96 | WD → |