Installation Mechanical Contracts including all piping and temperature control work over $7.0 million — Prevailing Wage Rates
Davis-Bacon prevailing wages for Installation Mechanical Contracts including all piping and temperature control work over $7.0 millions across all covered states and counties. Rates vary by location and construction type.
Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Installation Mechanical Contracts including all piping and temperature control work over $7.0 million is $80.73/hr, with the middle 80% of counties paying between $79.98 and $80.73/hr. The highest state average is Missouri at $79.86/hr; the lowest is Missouri at $79.86/hr.
Range: $68.65 – $80.73/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
33 county-level rates for Installation Mechanical Contracts including all piping and temperature control work over $7.0 million, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adair | MO | building | $46.66 | $21.99 | $68.65 | WD → |
| Atchison | MO | building | $46.66 | $21.99 | $68.65 | WD → |
| Clark | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Crawford | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Daviess | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Dent | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Gasconade | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Gentry | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Grundy | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Harrison | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Holt | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Knox | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Lewis | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Linn | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Livingston | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Macon | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Maries | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Marion | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Mercer | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Miller | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Monroe | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Montgomery | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Morgan | MO | building | $50.60 | $29.38 | $79.98 | WD → |
| Nodaway | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Pike | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Putnam | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Randolph | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Saline | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Schuyler | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Scotland | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Shelby | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Sullivan | MO | building | $50.60 | $30.13 | $80.73 | WD → |
| Worth | MO | building | $50.60 | $30.13 | $80.73 | WD → |