Installation Mechanical Contracts including all piping and temperature control work over $7.0 million — Prevailing Wage Rates

Davis-Bacon prevailing wages for Installation Mechanical Contracts including all piping and temperature control work over $7.0 millions across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 33 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Installation Mechanical Contracts including all piping and temperature control work over $7.0 million is $80.73/hr, with the middle 80% of counties paying between $79.98 and $80.73/hr. The highest state average is Missouri at $79.86/hr; the lowest is Missouri at $79.86/hr.

Bottom 10%
$79.98
Median
$80.73
Average
$79.86
Top 10%
$80.73

Range: $68.65 – $80.73/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Missouri MO
Avg base: $50.36/hr
Avg total: $79.86/hr
33 rates

All Rates

33 county-level rates for Installation Mechanical Contracts including all piping and temperature control work over $7.0 million, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adair MO building $46.66 $21.99 $68.65 WD →
Atchison MO building $46.66 $21.99 $68.65 WD →
Clark MO building $50.60 $30.13 $80.73 WD →
Crawford MO building $50.60 $30.13 $80.73 WD →
Daviess MO building $50.60 $30.13 $80.73 WD →
Dent MO building $50.60 $29.38 $79.98 WD →
Gasconade MO building $50.60 $29.38 $79.98 WD →
Gentry MO building $50.60 $30.13 $80.73 WD →
Grundy MO building $50.60 $30.13 $80.73 WD →
Harrison MO building $50.60 $30.13 $80.73 WD →
Holt MO building $50.60 $30.13 $80.73 WD →
Knox MO building $50.60 $30.13 $80.73 WD →
Lewis MO building $50.60 $30.13 $80.73 WD →
Linn MO building $50.60 $30.13 $80.73 WD →
Livingston MO building $50.60 $30.13 $80.73 WD →
Macon MO building $50.60 $30.13 $80.73 WD →
Maries MO building $50.60 $29.38 $79.98 WD →
Marion MO building $50.60 $30.13 $80.73 WD →
Mercer MO building $50.60 $30.13 $80.73 WD →
Miller MO building $50.60 $29.38 $79.98 WD →
Monroe MO building $50.60 $30.13 $80.73 WD →
Montgomery MO building $50.60 $29.38 $79.98 WD →
Morgan MO building $50.60 $29.38 $79.98 WD →
Nodaway MO building $50.60 $30.13 $80.73 WD →
Pike MO building $50.60 $30.13 $80.73 WD →
Putnam MO building $50.60 $30.13 $80.73 WD →
Randolph MO building $50.60 $30.13 $80.73 WD →
Saline MO building $50.60 $30.13 $80.73 WD →
Schuyler MO building $50.60 $30.13 $80.73 WD →
Scotland MO building $50.60 $30.13 $80.73 WD →
Shelby MO building $50.60 $30.13 $80.73 WD →
Sullivan MO building $50.60 $30.13 $80.73 WD →
Worth MO building $50.60 $30.13 $80.73 WD →
Top-paying counties for Installation Mechanical Contracts including all piping and temperature control work over $7.0 million →