Wage Determination MO20260033-15893-bld

Morgan, MO · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260033-15893-bld covers 50 trade classifications for building construction in Morgan, MO. Total packages (base + fringe) range from $24.90/hr to $85.86/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260033-15893-bld
Revision: 1
Type: building
County: Morgan
State: MO
Effective: May 17, 2026
Trades covered: 50
Highest rate: $85.86/hr
Official source: SAM.gov reference MO20260033View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $27.66 $5.88 $33.54 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING & FORM WORK $39.53 $21.85 $61.38 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING & FORM WORK $41.30 $21.85 $63.15 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING & FORM WORK $44.19 $21.85 $66.04 $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING, FORM WORK & RESILIENT/VINYL FLOOR INSTALLATION $31.51 $22.25 $53.76 $0.00 $0.00 $0.00 $0.00
CARPENTER: RESILIENT & VINYL FLOORING ONLY $40.08 $21.85 $61.93 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.52 $15.88 $49.40 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $36.63 $9.85 $46.48 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 $0.00 $0.00 $0.00 $0.00
GLAZIER $29.87 $1.47 $31.34 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.02 $9.49 $30.51 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $41.67 $31.25 $72.92 $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $24.90 $0.00 $24.90 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $28.95 $14.95 $43.90 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $32.23 $15.91 $48.14 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.71 $15.50 $45.21 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $26.95 $14.95 $41.90 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $30.33 $15.91 $46.24 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $27.71 $15.50 $43.21 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, LANDSCAPE & BRICK MASON TENDER $41.18 $15.96 $57.14 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $33.90 $17.21 $51.11 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, & DRYWALL FINISHING/TAPING ONLY $28.56 $17.21 $45.77 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $25.39 $17.76 $43.15 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $34.90 $17.21 $52.11 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $30.13 $78.79 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $29.38 $79.98 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $30.13 $78.79 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $29.38 $79.98 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $35.76 $30.38 $66.14 $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 $0.00 $0.00 $0.00 $0.00
ROOFER $32.25 $17.46 $49.71 $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.53 $73.47 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57 $0.00 $0.00 $0.00 $0.00
View all WDs for Morgan → Revision history →