Wage determination MO20260028-15701-bld covers 40 trade classifications for building construction in Adair, MO. Total packages (base + fringe) range from $19.38/hr to $80.73/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260028-15701-bld
Revision: 2
Type: building
County: Adair
State: MO
Effective: May 17, 2026
Trades covered: 40
Highest rate: $80.73/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 | $58.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $32.37 | $20.17 | $52.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $36.33 | $19.73 | $56.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $31.51 | $22.25 | $53.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $39.59 | $22.40 | $61.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $37.60 | $22.14 | $59.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $43.20 | $21.50 | $64.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $26.44 | $0.00 | $26.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $14.19 | $5.19 | $19.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $36.30 | $25.80 | $62.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $32.51 | $15.75 | $48.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: BRICK MASON TENDER | $30.78 | $16.05 | $46.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $32.31 | $15.75 | $48.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL & LANDSCAPE | $28.78 | $16.05 | $44.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $28.56 | $17.21 | $45.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER ONLY | $36.18 | $19.97 | $56.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $49.45 | $26.65 | $76.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER | $48.66 | $22.79 | $71.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION | $50.60 | $30.13 | $80.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $49.45 | $26.65 | $76.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER | $46.66 | $21.99 | $68.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION | $46.66 | $21.99 | $68.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER..$ 45.48 22.42 POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER..$ 45.48 22.42 POWER EQUIPMENT OPERATOR: PAVER | $45.48 | $22.42 | $67.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.60 | $19.99 | $53.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $34.50 | $19.74 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 | $73.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $36.51 | $22.39 | $58.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $40.53 | $15.99 | $56.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.79 | $21.31 | $54.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | $0.00 | $0.00 | $0.00 | $0.00 |