Wage determination MO20260056-15769-bld covers 31 trade classifications for building construction in Crawford, MO. Total packages (base + fringe) range from $17.78/hr to $101.17/hr, with the highest going to VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260056-15769-bld
Revision: 1
Type: building
County: Crawford
State: MO
Effective: May 17, 2026
Trades covered: 31
Highest rate: $101.17/hr
Official source: SAM.gov reference MO20260056View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $46.00 $36.25 $82.25 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.15 $23.90 $65.05 $0.00 $0.00 $0.00 $0.00
CARPENTER $44.19 $21.85 $66.04 $0.00 $0.00 $0.00 $0.00
CARPENTER $40.08 $21.85 $61.93 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $36.63 $9.85 $46.48 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 $0.00 $0.00 $0.00 $0.00
GLAZIER $40.00 $24.25 $64.25 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK & CEMENT/CONCRETE MASON TENDER $32.23 $15.30 $47.53 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; ASPHALT SHOVELER; PIPELAYER $30.33 $15.30 $45.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: HOIST $26.02 $13.01 $39.03 $0.00 $0.00 $0.00 $0.00
PAINTER $34.90 $17.21 $52.11 $0.00 $0.00 $0.00 $0.00
PAINTER $33.90 $17.21 $51.11 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $17.78 $0.00 $17.78 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.60 $30.13 $80.73 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $48.66 $22.79 $71.45 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.60 $30.13 $80.73 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $48.66 $22.79 $71.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FORKLIFT $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER/BLADE $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: PAVER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.94 $27.52 $73.46 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.50 $18.15 $46.65 $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.09 $19.91 $54.00 $0.00 $0.00 $0.00 $0.00
VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, M $62.73 $38.44 $101.17 $0.00 $0.00 $0.00 $0.00
View all WDs for Crawford → Revision history →