Wage Determination MO20260031-14359-bld

Knox, MO · building · Rev. 3 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260031-14359-bld covers 63 trade classifications for building construction in Knox, MO. Total packages (base + fringe) range from $19.38/hr to $85.86/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260031-14359-bld
Revision: 3
Type: building
County: Knox
State: MO
Effective: May 17, 2026
Trades covered: 63
Highest rate: $85.86/hr
Official source: SAM.gov reference MO20260031View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $43.48 $27.24 $70.72 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.26 $20.54 $58.80 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.37 $20.17 $52.54 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.06 $24.35 $60.41 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.15 $23.90 $65.05 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $42.06 $22.40 $64.46 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $39.48 $22.40 $61.88 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $35.49 $21.85 $57.34 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $31.51 $22.25 $53.76 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $39.59 $22.40 $61.99 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER $41.71 $21.85 $63.56 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION $36.99 $21.85 $58.84 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $54.01 $27.85 $81.86 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.60 $22.14 $59.74 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.20 $21.50 $64.70 $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $41.67 $31.25 $72.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL $36.30 $25.80 $62.10 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $29.65 $16.95 $46.60 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $30.01 $15.75 $45.76 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $32.51 $15.75 $48.26 $0.00 $0.00 $0.00 $0.00
LABORER: BRICK MASON TENDER $30.78 $16.05 $46.83 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $29.25 $16.95 $46.20 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $29.81 $15.75 $45.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $32.31 $15.75 $48.06 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL & LANDSCAPE $28.78 $16.05 $44.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $39.40 $17.66 $57.06 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $24.43 $17.76 $42.19 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $28.56 $17.21 $45.77 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER ONLY $36.10 $19.97 $56.07 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $22.79 $71.45 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $30.13 $80.73 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $49.45 $26.65 $76.10 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER $48.66 $22.79 $71.45 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION $50.60 $30.13 $80.73 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $39.06 $30.38 $69.44 $0.00 $0.00 $0.00 $0.00
ROOFER $40.00 $22.05 $62.05 $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 $0.00 $0.00 $0.00 $0.00
ROOFER $34.50 $18.96 $53.46 $0.00 $0.00 $0.00 $0.00
ROOFER $33.60 $19.99 $53.59 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $52.00 $27.12 $79.12 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $36.51 $22.39 $58.90 $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $15.99 $56.52 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 $0.00 $0.00 $0.00 $0.00