Hoisting) GROUP 8 — Prevailing Wage Rates
Davis-Bacon prevailing wages for Hoisting) GROUP 8s across all covered states and counties. Rates vary by location and construction type.
Quick Answer
Across 45 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Hoisting) GROUP 8 is $99.78/hr, with the middle 80% of counties paying between $73.73 and $99.78/hr. The highest state average is California at $95.15/hr; the lowest is California at $95.15/hr.
Bottom 10%
$73.73
Median
$99.78
Average
$95.15
Top 10%
$99.78
Range: $73.73 – $99.78/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
45 county-level rates for Hoisting) GROUP 8, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Imperial | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| Imperial | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Imperial | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Inyo | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Inyo | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Inyo | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Kern | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Kern | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Kern | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Los Angeles | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Los Angeles | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Los Angeles | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| Los Angeles | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Mono | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Mono | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Mono | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Orange | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Orange | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| Orange | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Orange | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Riverside | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Riverside | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| Riverside | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Riverside | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| San Bernardino | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| San Bernardino | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| San Bernardino | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| San Bernardino | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| San Diego | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| San Diego | CA | residential | $66.58 | $33.20 | $99.78 | WD → |
| San Diego | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| San Diego | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| San Luis Obispo | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| San Luis Obispo | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| San Luis Obispo | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| San Luis Obispo | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Santa Barbara | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Santa Barbara | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Santa Barbara | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Santa Barbara | CA | residential | $48.48 | $25.25 | $73.73 | WD → |
| Ventura | CA | highway | $66.58 | $33.20 | $99.78 | WD → |
| Ventura | CA | building | $66.58 | $33.20 | $99.78 | WD → |
| Ventura | CA | heavy | $66.58 | $33.20 | $99.78 | WD → |
| Ventura | CA | residential | $48.48 | $25.25 | $73.73 | WD → |