CARPENTER
|
$33.55 |
$30.07 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$37.06 |
$31.16 |
$68.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$37.85 |
$25.77 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$35.65 |
$27.97 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$36.20 |
$21.92 |
$58.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$31.55 |
$25.97 |
$57.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$32.15 |
$25.97 |
$58.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER (CHRISTIAN, MENARD, AND SANGAMON COUNTIES)
|
$32.15 |
$25.97 |
$58.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER (MACON, MOULTRIE, PIATT, SANGAMON AND SHELBY COUNTIES)
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$31.91 |
$21.93 |
$53.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$28.64 |
$24.57 |
$53.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$33.71 |
$18.91 |
$52.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER (DE WITT & MACON COUNTIES)
|
$35.63 |
$31.88 |
$67.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER (DEWITT)
|
$38.75 |
$31.92 |
$70.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$35.00 |
$20.67 |
$55.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$41.00 |
$27.36 |
$68.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (CHRISTIAN, COLES, CUMBERLAND, DE WITT, DOUGLAS, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES)
|
$41.00 |
$20.68 |
$61.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (MASON COUNTY)
|
$37.51 |
$21.67 |
$59.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIANS
|
$41.25 |
$21.30 |
$62.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER
|
$38.00 |
$26.39 |
$64.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (ADAMS AND SCHUYLER COUNTIES)
|
$36.30 |
$25.80 |
$62.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (BROWN, CASS, CHRISTIAN, DEWITT, LOGAN, MACON, MASON, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES)
|
$37.60 |
$32.94 |
$70.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (MACON COUNTY)
|
$37.71 |
$29.65 |
$67.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER
|
$33.50 |
$29.33 |
$62.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER
|
$33.63 |
$31.76 |
$65.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER
|
$34.04 |
$29.26 |
$63.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER
|
$37.47 |
$28.77 |
$66.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
|
$38.38 |
$18.82 |
$57.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER
|
$38.18 |
$19.92 |
$58.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
|
$56.61 |
$24.20 |
$80.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD
|
$46.49 |
$22.33 |
$68.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
|
$40.36 |
$19.41 |
$59.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
|
$42.85 |
$20.14 |
$62.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT
|
$52.63 |
$24.35 |
$76.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUY
|
$39.92 |
$20.22 |
$60.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J
|
$52.13 |
$23.97 |
$76.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES)
|
$62.90 |
$26.06 |
$88.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, P
|
$58.58 |
$26.29 |
$84.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DER
|
$47.79 |
$43.42 |
$91.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT
|
$45.15 |
$26.00 |
$71.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORIN
|
$44.09 |
$43.42 |
$87.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER; TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 T
|
$38.03 |
$43.42 |
$81.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM
|
$35.29 |
$14.50 |
$49.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM
|
$32.23 |
$20.58 |
$52.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BLASTING, SPRAYING & PRESSURE WASHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR
|
$28.37 |
$21.05 |
$49.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM
|
$32.45 |
$17.12 |
$49.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GR
|
$27.37 |
$21.05 |
$48.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK
|
$40.00 |
$26.90 |
$66.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: PAPERHANGING AND DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREM
|
$30.50 |
$22.30 |
$52.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$33.55 |
$30.07 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$37.06 |
$31.16 |
$68.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$37.85 |
$25.77 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$35.65 |
$27.97 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$37.20 |
$21.92 |
$59.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$32.55 |
$25.97 |
$58.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN (CHRISTIAN, MENARD, AND SANGAMON COUNTIES)
|
$33.15 |
$25.97 |
$59.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN (MACON, MOULTRIE, PIATT, SANGAMON AND SHELBY COUNTIES)
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT
|
$47.21 |
$30.20 |
$77.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC
|
$41.88 |
$30.20 |
$72.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS FIREMENT, GENERATOR
|
$33.67 |
$30.20 |
$63.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN
|
$48.81 |
$30.20 |
$79.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PREMIUM
|
$31.25 |
$22.30 |
$53.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PREMIUM
|
$30.50 |
$22.30 |
$52.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE
|
$45.29 |
$25.42 |
$70.71 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE
|
$43.28 |
$27.56 |
$70.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPAR
|
$38.55 |
$16.11 |
$54.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN
|
$43.24 |
$24.27 |
$67.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN
|
$45.35 |
$25.72 |
$71.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2
|
$43.83 |
$24.27 |
$68.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE
|
$45.88 |
$25.42 |
$71.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE
|
$43.86 |
$27.56 |
$71.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS
|
$38.97 |
$16.11 |
$55.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3
|
$39.18 |
$16.11 |
$55.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3
|
$46.25 |
$25.72 |
$71.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE
|
$46.15 |
$25.42 |
$71.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE
|
$44.15 |
$27.56 |
$71.71 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE
|
$46.54 |
$25.42 |
$71.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE
|
$44.53 |
$27.56 |
$72.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS
|
$44.49 |
$24.27 |
$68.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS
|
$46.60 |
$25.72 |
$72.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. TRUCK DRIVER, GROUP 3
|
$44.10 |
$24.27 |
$68.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE
|
$47.64 |
$25.42 |
$73.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE
|
$45.61 |
$27.56 |
$73.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK
|
$45.59 |
$24.27 |
$69.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK
|
$47.71 |
$25.72 |
$73.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. FOOTNOTE: A. $46.20 PER DAY
|
$39.44 |
$16.11 |
$55.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH
|
$30.05 |
$26.00 |
$56.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WASTE WORK. FOOTNOTE: TRUCK DRIVER, GROUP 4 LOW BOY; OIL DISTRIBUTORS FOOTNOTE: A. $46.20 PER DAY
|
$39.44 |
$16.11 |
$55.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK
|
$45.93 |
$25.72 |
$71.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |