Wage Determination IL20260015-16765-hwy

Menard, IL · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination IL20260015-16765-hwy covers 91 trade classifications for highway construction in Menard, IL. Total packages (base + fringe) range from $48.42/hr to $91.21/hr, with the highest going to OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: IL20260015-16765-hwy
Revision: 1
Type: highway
County: Menard
State: IL
Effective: May 17, 2026
Trades covered: 91
Highest rate: $91.21/hr
Official source: SAM.gov reference IL20260015View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.55 $30.07 $63.62 $0.00 $0.00 $0.00 $0.00
CARPENTER $37.06 $31.16 $68.22 $0.00 $0.00 $0.00 $0.00
CARPENTER $37.85 $25.77 $63.62 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.65 $27.97 $63.62 $0.00 $0.00 $0.00 $0.00
CARPENTER $36.20 $21.92 $58.12 $0.00 $0.00 $0.00 $0.00
CARPENTER $31.55 $25.97 $57.52 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.05 $28.57 $63.62 $0.00 $0.00 $0.00 $0.00
CARPENTER $32.15 $25.97 $58.12 $0.00 $0.00 $0.00 $0.00
CARPENTER (CHRISTIAN, MENARD, AND SANGAMON COUNTIES) $32.15 $25.97 $58.12 $0.00 $0.00 $0.00 $0.00
CARPENTER (MACON, MOULTRIE, PIATT, SANGAMON AND SHELBY COUNTIES) $35.05 $28.57 $63.62 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $31.91 $21.93 $53.84 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.64 $24.57 $53.21 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.71 $18.91 $52.62 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (DE WITT & MACON COUNTIES) $35.63 $31.88 $67.51 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (DEWITT) $38.75 $31.92 $70.67 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.00 $20.67 $55.67 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $27.36 $68.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CHRISTIAN, COLES, CUMBERLAND, DE WITT, DOUGLAS, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) $41.00 $20.68 $61.68 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MASON COUNTY) $37.51 $21.67 $59.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $41.25 $21.30 $62.55 $0.00 $0.00 $0.00 $0.00
IRONWORKER $38.00 $26.39 $64.39 $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS AND SCHUYLER COUNTIES) $36.30 $25.80 $62.10 $0.00 $0.00 $0.00 $0.00
IRONWORKER (BROWN, CASS, CHRISTIAN, DEWITT, LOGAN, MACON, MASON, MENARD, MORGAN, PIKE, SANGAMON, SCHUYLER, SCOTT, AND SHELBY COUNTIES) $37.60 $32.94 $70.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER (MACON COUNTY) $37.71 $29.65 $67.36 $0.00 $0.00 $0.00 $0.00
LABORER $33.50 $29.33 $62.83 $0.00 $0.00 $0.00 $0.00
LABORER $33.63 $31.76 $65.39 $0.00 $0.00 $0.00 $0.00
LABORER $34.04 $29.26 $63.30 $0.00 $0.00 $0.00 $0.00
LABORER $37.47 $28.77 $66.24 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES) $38.38 $18.82 $57.20 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER $38.18 $19.92 $58.10 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES) $56.61 $24.20 $80.81 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD $46.49 $22.33 $68.82 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES) $40.36 $19.41 $59.77 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES) $42.85 $20.14 $62.99 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT $52.63 $24.35 $76.98 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, PIATT, SCHUY $39.92 $20.22 $60.14 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J $52.13 $23.97 $76.10 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (CASS, LOGAN, MASON, MENARD, MORGAN, SCOTT, AND SANGAMON COUNTIES) $62.90 $26.06 $88.96 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (ADAMS, BROWN, CASS, CHAMPAIGN, CHRISTIAN, DEWITT, DOUGLAS, EDGAR, LOGAN, MACON, MASON, MENARD, P $58.58 $26.29 $84.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DER $47.79 $43.42 $91.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT $45.15 $26.00 $71.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORIN $44.09 $43.42 $87.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER; TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 T $38.03 $43.42 $81.45 $0.00 $0.00 $0.00 $0.00
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $35.29 $14.50 $49.79 $0.00 $0.00 $0.00 $0.00
PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM $32.23 $20.58 $52.81 $0.00 $0.00 $0.00 $0.00
PAINTER: BLASTING, SPRAYING & PRESSURE WASHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR $28.37 $21.05 $49.42 $0.00 $0.00 $0.00 $0.00
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $32.45 $17.12 $49.57 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GR $27.37 $21.05 $48.42 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK $40.00 $26.90 $66.90 $0.00 $0.00 $0.00 $0.00
PAINTER: PAPERHANGING AND DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREM $30.50 $22.30 $52.80 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $33.55 $30.07 $63.62 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $37.06 $31.16 $68.22 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $37.85 $25.77 $63.62 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $35.65 $27.97 $63.62 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $37.20 $21.92 $59.12 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $32.55 $25.97 $58.52 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $35.05 $28.57 $63.62 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (CHRISTIAN, MENARD, AND SANGAMON COUNTIES) $33.15 $25.97 $59.12 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (MACON, MOULTRIE, PIATT, SANGAMON AND SHELBY COUNTIES) $35.05 $28.57 $63.62 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONT $47.21 $30.20 $77.41 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC $41.88 $30.20 $72.08 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS FIREMENT, GENERATOR $33.67 $30.20 $63.87 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN $48.81 $30.20 $79.01 $0.00 $0.00 $0.00 $0.00
PREMIUM $31.25 $22.30 $53.55 $0.00 $0.00 $0.00 $0.00
PREMIUM $30.50 $22.30 $52.80 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE $45.29 $25.42 $70.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE $43.28 $27.56 $70.84 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLE TRUCKSHAULING LESS THAN 9 TON; AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPAR $38.55 $16.11 $54.66 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN $43.24 $24.27 $67.51 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN $45.35 $25.72 $71.07 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 $43.83 $24.27 $68.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE $45.88 $25.42 $71.30 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE $43.86 $27.56 $71.42 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 2: 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TON BUT HAULING LESS THAN 16 TON; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS $38.97 $16.11 $55.08 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 $39.18 $16.11 $55.29 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 $46.25 $25.72 $71.97 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE $46.15 $25.42 $71.57 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 3 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE $44.15 $27.56 $71.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE $46.54 $25.42 $71.96 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE $44.53 $27.56 $72.09 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS $44.49 $24.27 $68.76 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS $46.60 $25.72 $72.32 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. TRUCK DRIVER, GROUP 3 $44.10 $24.27 $68.37 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 (CHAMPAIGN, COLES, DEWITT, DOUGLAS, MOULTRIE (EAST OF A LINE FROM THE NORTHEAST CORNER OF THE COUNTY EXTENDING SOUTHEAST IN THE $47.64 $25.42 $73.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 (CHRISTIAN,MACON, MOULTRIE, PIATT, SHELBY (WEST OF AN IMAGINARY LINE BEGINNING AT THE NORTHEAST BORDER WITH MOULTRIE COUNTY EXTE $45.61 $27.56 $73.17 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $45.59 $24.27 $69.86 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK $47.71 $25.72 $73.43 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. FOOTNOTE: A. $46.20 PER DAY $39.44 $16.11 $55.55 $0.00 $0.00 $0.00 $0.00
UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH $30.05 $26.00 $56.05 $0.00 $0.00 $0.00 $0.00
WASTE WORK. FOOTNOTE: TRUCK DRIVER, GROUP 4 LOW BOY; OIL DISTRIBUTORS FOOTNOTE: A. $46.20 PER DAY $39.44 $16.11 $55.55 $0.00 $0.00 $0.00 $0.00
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK $45.93 $25.72 $71.65 $0.00 $0.00 $0.00 $0.00
View all WDs for Menard → Revision history →