POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC — Prevailing Wage Rates
Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCs across all covered states and counties. Rates vary by location and construction type.
Across 92 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC is $72.08/hr, with the middle 80% of counties paying between $66.93 and $72.08/hr. The highest state average is Illinois at $69.62/hr; the lowest is Illinois at $69.62/hr.
Range: $66.93 – $72.08/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073 — Operating Engineers and Other Construction Equipment Operators.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
92 county-level rates for POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONC, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Adams | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Alexander | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Brown | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Brown | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Cass | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Cass | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Champaign | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Champaign | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Champaign | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Christian | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Christian | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Christian | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Clark | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Clark | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Clark | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Clay | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Coles | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Coles | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Coles | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Crawford | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Cumberland | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Cumberland | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Cumberland | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| De Witt | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| De Witt | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| De Witt | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Douglas | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Douglas | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Douglas | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Edgar | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Edgar | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Edgar | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Edwards | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Effingham | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Fayette | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Ford | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Franklin | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Gallatin | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Hamilton | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Hardin | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Iroquois | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Jackson | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Jasper | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Jefferson | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Johnson | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Lawrence | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Logan | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Logan | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Macon | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Macon | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Marion | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Mason | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Mason | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Massac | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Menard | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Menard | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Menard | IL | residential | $38.18 | $28.75 | $66.93 | WD → |
| Morgan | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Morgan | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Moultrie | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Moultrie | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Moultrie | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Perry | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Piatt | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Piatt | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Piatt | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Pike | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Pike | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Pope | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Pulaski | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Richland | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Saline | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Sangamon | IL | residential | $38.18 | $28.75 | $66.93 | WD → |
| Sangamon | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Sangamon | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Sangamon | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Schuyler | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Schuyler | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Scott | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Scott | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Shelby | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Shelby | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Shelby | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Union | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Vermilion | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Vermilion | IL | highway | $41.88 | $30.20 | $72.08 | WD → |
| Vermilion | IL | heavy | $41.88 | $30.20 | $72.08 | WD → |
| Wabash | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Wayne | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| White | IL | building | $38.18 | $28.75 | $66.93 | WD → |
| Williamson | IL | building | $38.18 | $28.75 | $66.93 | WD → |