POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRANs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 94 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN is $79.01/hr, with the middle 80% of counties paying between $71.07 and $79.01/hr. The highest state average is Illinois at $75.12/hr; the lowest is Illinois at $75.12/hr.

Bottom 10%
$71.07
Median
$79.01
Average
$75.12
Top 10%
$79.01

Range: $71.07 – $79.01/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$79.01/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+179.9%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $45.63/hr
Avg total: $75.12/hr
94 rates

All Rates

94 county-level rates for POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $42.32 $28.75 $71.07 WD →
Adams IL heavy $48.81 $30.20 $79.01 WD →
Adams IL highway $48.81 $30.20 $79.01 WD →
Bond IL building $42.32 $28.75 $71.07 WD →
Boone IL building $42.32 $28.75 $71.07 WD →
Brown IL highway $48.81 $30.20 $79.01 WD →
Brown IL heavy $48.81 $30.20 $79.01 WD →
Brown IL building $42.32 $28.75 $71.07 WD →
Bureau IL building $42.32 $28.75 $71.07 WD →
Calhoun IL building $42.32 $28.75 $71.07 WD →
Carroll IL building $42.32 $28.75 $71.07 WD →
Cass IL heavy $48.81 $30.20 $79.01 WD →
Cass IL building $42.32 $28.75 $71.07 WD →
Cass IL highway $48.81 $30.20 $79.01 WD →
Champaign IL highway $48.81 $30.20 $79.01 WD →
Champaign IL heavy $48.81 $30.20 $79.01 WD →
Christian IL heavy $48.81 $30.20 $79.01 WD →
Christian IL highway $48.81 $30.20 $79.01 WD →
Clark IL heavy $48.81 $30.20 $79.01 WD →
Clark IL highway $48.81 $30.20 $79.01 WD →
Clinton IL building $42.32 $28.75 $71.07 WD →
Coles IL heavy $48.81 $30.20 $79.01 WD →
Coles IL highway $48.81 $30.20 $79.01 WD →
Cumberland IL heavy $48.81 $30.20 $79.01 WD →
Cumberland IL highway $48.81 $30.20 $79.01 WD →
De Kalb IL building $42.32 $28.75 $71.07 WD →
De Witt IL heavy $48.81 $30.20 $79.01 WD →
De Witt IL highway $48.81 $30.20 $79.01 WD →
Douglas IL heavy $48.81 $30.20 $79.01 WD →
Douglas IL highway $48.81 $30.20 $79.01 WD →
Edgar IL heavy $48.81 $30.20 $79.01 WD →
Edgar IL highway $48.81 $30.20 $79.01 WD →
Fulton IL building $42.32 $28.75 $71.07 WD →
Greene IL building $42.32 $28.75 $71.07 WD →
Hancock IL building $42.32 $28.75 $71.07 WD →
Henderson IL building $42.32 $28.75 $71.07 WD →
Henry IL building $42.32 $28.75 $71.07 WD →
Jersey IL building $42.32 $28.75 $71.07 WD →
Jo Daviess IL building $42.32 $28.75 $71.07 WD →
Knox IL building $42.32 $28.75 $71.07 WD →
La Salle IL building $42.32 $28.75 $71.07 WD →
Lee IL building $42.32 $28.75 $71.07 WD →
Livingston IL building $42.32 $28.75 $71.07 WD →
Logan IL heavy $48.81 $30.20 $79.01 WD →
Logan IL highway $48.81 $30.20 $79.01 WD →
Logan IL building $42.32 $28.75 $71.07 WD →
Macon IL highway $48.81 $30.20 $79.01 WD →
Macon IL heavy $48.81 $30.20 $79.01 WD →
Macoupin IL building $42.32 $28.75 $71.07 WD →
Marshall IL building $42.32 $28.75 $71.07 WD →
Mason IL building $42.32 $28.75 $71.07 WD →
Mason IL heavy $48.81 $30.20 $79.01 WD →
Mason IL highway $48.81 $30.20 $79.01 WD →
McDonough IL building $42.32 $28.75 $71.07 WD →
McLean IL building $42.32 $28.75 $71.07 WD →
Menard IL heavy $48.81 $30.20 $79.01 WD →
Menard IL building $42.32 $28.75 $71.07 WD →
Menard IL highway $48.81 $30.20 $79.01 WD →
Mercer IL building $42.32 $28.75 $71.07 WD →
Monroe IL building $42.32 $28.75 $71.07 WD →
Montgomery IL building $42.32 $28.75 $71.07 WD →
Morgan IL heavy $48.81 $30.20 $79.01 WD →
Morgan IL building $42.32 $28.75 $71.07 WD →
Morgan IL highway $48.81 $30.20 $79.01 WD →
Moultrie IL highway $48.81 $30.20 $79.01 WD →
Moultrie IL heavy $48.81 $30.20 $79.01 WD →
Ogle IL building $42.32 $28.75 $71.07 WD →
Piatt IL highway $48.81 $30.20 $79.01 WD →
Piatt IL heavy $48.81 $30.20 $79.01 WD →
Pike IL building $42.32 $28.75 $71.07 WD →
Pike IL heavy $48.81 $30.20 $79.01 WD →
Pike IL highway $48.81 $30.20 $79.01 WD →
Putnam IL building $42.32 $28.75 $71.07 WD →
Randolph IL building $42.32 $28.75 $71.07 WD →
Rock Island IL building $42.32 $28.75 $71.07 WD →
Sangamon IL heavy $48.81 $30.20 $79.01 WD →
Sangamon IL highway $48.81 $30.20 $79.01 WD →
Schuyler IL building $42.32 $28.75 $71.07 WD →
Schuyler IL heavy $48.81 $30.20 $79.01 WD →
Schuyler IL highway $48.81 $30.20 $79.01 WD →
Scott IL heavy $48.81 $30.20 $79.01 WD →
Scott IL highway $48.81 $30.20 $79.01 WD →
Scott IL building $42.32 $28.75 $71.07 WD →
Shelby IL heavy $48.81 $30.20 $79.01 WD →
Shelby IL highway $48.81 $30.20 $79.01 WD →
Stark IL building $42.32 $28.75 $71.07 WD →
Stephenson IL building $42.32 $28.75 $71.07 WD →
Vermilion IL highway $48.81 $30.20 $79.01 WD →
Vermilion IL heavy $48.81 $30.20 $79.01 WD →
Warren IL building $42.32 $28.75 $71.07 WD →
Washington IL building $42.32 $28.75 $71.07 WD →
Whiteside IL building $42.32 $28.75 $71.07 WD →
Winnebago IL building $42.32 $28.75 $71.07 WD →
Woodford IL building $42.32 $28.75 $71.07 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. PREMIUM PAY - CRAN →