PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM — Prevailing Wage Rates

Davis-Bacon prevailing wages for PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUMs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 137 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM is $52.81/hr, with the middle 80% of counties paying between $52.81 and $52.81/hr. The highest state average is Illinois at $52.77/hr; the lowest is Illinois at $52.77/hr.

Bottom 10%
$52.81
Median
$52.81
Average
$52.77
Top 10%
$52.81

Range: $50.31 – $52.81/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2141Painters, Construction and Maintenance.

Davis-Bacon median
$52.81/hr
National median total package (base + fringe)
BLS OEWS market median
$23.40/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+125.7%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $32.19/hr
Avg total: $52.77/hr
137 rates

All Rates

137 county-level rates for PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL highway $32.23 $20.58 $52.81 WD →
Adams IL heavy $32.23 $20.58 $52.81 WD →
Adams IL building $32.23 $20.58 $52.81 WD →
Alexander IL building $32.23 $20.58 $52.81 WD →
Bond IL building $32.23 $20.58 $52.81 WD →
Boone IL building $32.23 $20.58 $52.81 WD →
Brown IL building $32.23 $20.58 $52.81 WD →
Brown IL heavy $32.23 $20.58 $52.81 WD →
Brown IL highway $32.23 $20.58 $52.81 WD →
Bureau IL building $32.23 $20.58 $52.81 WD →
Calhoun IL building $32.23 $20.58 $52.81 WD →
Carroll IL building $32.23 $20.58 $52.81 WD →
Cass IL building $32.23 $20.58 $52.81 WD →
Cass IL heavy $32.23 $20.58 $52.81 WD →
Cass IL highway $32.23 $20.58 $52.81 WD →
Champaign IL highway $32.23 $20.58 $52.81 WD →
Champaign IL heavy $32.23 $20.58 $52.81 WD →
Champaign IL building $32.23 $20.58 $52.81 WD →
Christian IL heavy $32.23 $20.58 $52.81 WD →
Christian IL residential $29.73 $20.58 $50.31 WD →
Christian IL building $32.23 $20.58 $52.81 WD →
Christian IL highway $32.23 $20.58 $52.81 WD →
Clark IL highway $32.23 $20.58 $52.81 WD →
Clark IL heavy $32.23 $20.58 $52.81 WD →
Clark IL building $32.23 $20.58 $52.81 WD →
Clay IL building $32.23 $20.58 $52.81 WD →
Clinton IL building $32.23 $20.58 $52.81 WD →
Coles IL building $32.23 $20.58 $52.81 WD →
Coles IL highway $32.23 $20.58 $52.81 WD →
Coles IL heavy $32.23 $20.58 $52.81 WD →
Crawford IL building $32.23 $20.58 $52.81 WD →
Cumberland IL building $32.23 $20.58 $52.81 WD →
Cumberland IL heavy $32.23 $20.58 $52.81 WD →
Cumberland IL highway $32.23 $20.58 $52.81 WD →
De Kalb IL building $32.23 $20.58 $52.81 WD →
De Witt IL highway $32.23 $20.58 $52.81 WD →
De Witt IL heavy $32.23 $20.58 $52.81 WD →
De Witt IL building $32.23 $20.58 $52.81 WD →
Douglas IL highway $32.23 $20.58 $52.81 WD →
Douglas IL heavy $32.23 $20.58 $52.81 WD →
Douglas IL building $32.23 $20.58 $52.81 WD →
Edgar IL highway $32.23 $20.58 $52.81 WD →
Edgar IL building $32.23 $20.58 $52.81 WD →
Edgar IL heavy $32.23 $20.58 $52.81 WD →
Edwards IL building $32.23 $20.58 $52.81 WD →
Effingham IL building $32.23 $20.58 $52.81 WD →
Fayette IL building $32.23 $20.58 $52.81 WD →
Ford IL building $32.23 $20.58 $52.81 WD →
Franklin IL building $32.23 $20.58 $52.81 WD →
Fulton IL building $32.23 $20.58 $52.81 WD →
Gallatin IL building $32.23 $20.58 $52.81 WD →
Greene IL building $32.23 $20.58 $52.81 WD →
Hamilton IL building $32.23 $20.58 $52.81 WD →
Hancock IL building $32.23 $20.58 $52.81 WD →
Hardin IL building $32.23 $20.58 $52.81 WD →
Henderson IL building $32.23 $20.58 $52.81 WD →
Henry IL building $32.23 $20.58 $52.81 WD →
Iroquois IL building $32.23 $20.58 $52.81 WD →
Jackson IL building $32.23 $20.58 $52.81 WD →
Jasper IL building $32.23 $20.58 $52.81 WD →
Jefferson IL building $32.23 $20.58 $52.81 WD →
Jersey IL building $32.23 $20.58 $52.81 WD →
Jo Daviess IL building $32.23 $20.58 $52.81 WD →
Johnson IL building $32.23 $20.58 $52.81 WD →
Knox IL building $32.23 $20.58 $52.81 WD →
La Salle IL building $32.23 $20.58 $52.81 WD →
Lawrence IL building $32.23 $20.58 $52.81 WD →
Lee IL building $32.23 $20.58 $52.81 WD →
Livingston IL building $32.23 $20.58 $52.81 WD →
Logan IL highway $32.23 $20.58 $52.81 WD →
Logan IL heavy $32.23 $20.58 $52.81 WD →
Logan IL building $32.23 $20.58 $52.81 WD →
Macon IL highway $32.23 $20.58 $52.81 WD →
Macon IL heavy $32.23 $20.58 $52.81 WD →
Macoupin IL building $32.23 $20.58 $52.81 WD →
Marion IL building $32.23 $20.58 $52.81 WD →
Marshall IL building $32.23 $20.58 $52.81 WD →
Mason IL building $32.23 $20.58 $52.81 WD →
Mason IL heavy $32.23 $20.58 $52.81 WD →
Mason IL highway $32.23 $20.58 $52.81 WD →
Massac IL building $32.23 $20.58 $52.81 WD →
McDonough IL building $32.23 $20.58 $52.81 WD →
McLean IL building $32.23 $20.58 $52.81 WD →
Menard IL heavy $32.23 $20.58 $52.81 WD →
Menard IL building $32.23 $20.58 $52.81 WD →
Menard IL residential $29.73 $20.58 $50.31 WD →
Menard IL highway $32.23 $20.58 $52.81 WD →
Mercer IL building $32.23 $20.58 $52.81 WD →
Monroe IL building $32.23 $20.58 $52.81 WD →
Montgomery IL building $32.23 $20.58 $52.81 WD →
Morgan IL building $32.23 $20.58 $52.81 WD →
Morgan IL heavy $32.23 $20.58 $52.81 WD →
Morgan IL highway $32.23 $20.58 $52.81 WD →
Moultrie IL building $32.23 $20.58 $52.81 WD →
Moultrie IL highway $32.23 $20.58 $52.81 WD →
Moultrie IL heavy $32.23 $20.58 $52.81 WD →
Ogle IL building $32.23 $20.58 $52.81 WD →
Perry IL building $32.23 $20.58 $52.81 WD →
Piatt IL heavy $32.23 $20.58 $52.81 WD →
Piatt IL building $32.23 $20.58 $52.81 WD →
Top-paying counties for PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM →