LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 126 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD is $68.82/hr, with the middle 80% of counties paying between $68.82 and $68.82/hr. The highest state average is Illinois at $68.82/hr; the lowest is Illinois at $68.82/hr.

Bottom 10%
$68.82
Median
$68.82
Average
$68.82
Top 10%
$68.82

Range: $68.82 – $68.82/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$68.82/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+54.7%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $46.49/hr
Avg total: $68.82/hr
126 rates

All Rates

126 county-level rates for LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL highway $46.49 $22.33 $68.82 WD →
Adams IL heavy $46.49 $22.33 $68.82 WD →
Alexander IL heavy $46.49 $22.33 $68.82 WD →
Alexander IL highway $46.49 $22.33 $68.82 WD →
Bond IL highway $46.49 $22.33 $68.82 WD →
Bond IL heavy $46.49 $22.33 $68.82 WD →
Brown IL highway $46.49 $22.33 $68.82 WD →
Brown IL heavy $46.49 $22.33 $68.82 WD →
Calhoun IL heavy $46.49 $22.33 $68.82 WD →
Calhoun IL highway $46.49 $22.33 $68.82 WD →
Cass IL heavy $46.49 $22.33 $68.82 WD →
Cass IL highway $46.49 $22.33 $68.82 WD →
Champaign IL heavy $46.49 $22.33 $68.82 WD →
Champaign IL highway $46.49 $22.33 $68.82 WD →
Christian IL heavy $46.49 $22.33 $68.82 WD →
Christian IL highway $46.49 $22.33 $68.82 WD →
Clark IL heavy $46.49 $22.33 $68.82 WD →
Clark IL highway $46.49 $22.33 $68.82 WD →
Clay IL heavy $46.49 $22.33 $68.82 WD →
Clay IL highway $46.49 $22.33 $68.82 WD →
Clinton IL heavy $46.49 $22.33 $68.82 WD →
Clinton IL highway $46.49 $22.33 $68.82 WD →
Coles IL heavy $46.49 $22.33 $68.82 WD →
Coles IL highway $46.49 $22.33 $68.82 WD →
Crawford IL heavy $46.49 $22.33 $68.82 WD →
Crawford IL highway $46.49 $22.33 $68.82 WD →
Cumberland IL heavy $46.49 $22.33 $68.82 WD →
Cumberland IL highway $46.49 $22.33 $68.82 WD →
De Witt IL highway $46.49 $22.33 $68.82 WD →
De Witt IL heavy $46.49 $22.33 $68.82 WD →
Douglas IL highway $46.49 $22.33 $68.82 WD →
Douglas IL heavy $46.49 $22.33 $68.82 WD →
Edgar IL heavy $46.49 $22.33 $68.82 WD →
Edgar IL highway $46.49 $22.33 $68.82 WD →
Edwards IL heavy $46.49 $22.33 $68.82 WD →
Edwards IL highway $46.49 $22.33 $68.82 WD →
Effingham IL highway $46.49 $22.33 $68.82 WD →
Effingham IL heavy $46.49 $22.33 $68.82 WD →
Fayette IL heavy $46.49 $22.33 $68.82 WD →
Fayette IL highway $46.49 $22.33 $68.82 WD →
Franklin IL heavy $46.49 $22.33 $68.82 WD →
Franklin IL highway $46.49 $22.33 $68.82 WD →
Gallatin IL highway $46.49 $22.33 $68.82 WD →
Gallatin IL heavy $46.49 $22.33 $68.82 WD →
Greene IL highway $46.49 $22.33 $68.82 WD →
Greene IL heavy $46.49 $22.33 $68.82 WD →
Hamilton IL heavy $46.49 $22.33 $68.82 WD →
Hamilton IL highway $46.49 $22.33 $68.82 WD →
Hardin IL highway $46.49 $22.33 $68.82 WD →
Hardin IL heavy $46.49 $22.33 $68.82 WD →
Jackson IL highway $46.49 $22.33 $68.82 WD →
Jackson IL heavy $46.49 $22.33 $68.82 WD →
Jasper IL heavy $46.49 $22.33 $68.82 WD →
Jasper IL highway $46.49 $22.33 $68.82 WD →
Jefferson IL highway $46.49 $22.33 $68.82 WD →
Jefferson IL heavy $46.49 $22.33 $68.82 WD →
Jersey IL highway $46.49 $22.33 $68.82 WD →
Jersey IL heavy $46.49 $22.33 $68.82 WD →
Johnson IL highway $46.49 $22.33 $68.82 WD →
Johnson IL heavy $46.49 $22.33 $68.82 WD →
Lawrence IL heavy $46.49 $22.33 $68.82 WD →
Lawrence IL highway $46.49 $22.33 $68.82 WD →
Logan IL heavy $46.49 $22.33 $68.82 WD →
Logan IL highway $46.49 $22.33 $68.82 WD →
Macon IL heavy $46.49 $22.33 $68.82 WD →
Macon IL highway $46.49 $22.33 $68.82 WD →
Macoupin IL heavy $46.49 $22.33 $68.82 WD →
Macoupin IL highway $46.49 $22.33 $68.82 WD →
Madison IL highway $46.49 $22.33 $68.82 WD →
Madison IL heavy $46.49 $22.33 $68.82 WD →
Marion IL highway $46.49 $22.33 $68.82 WD →
Marion IL heavy $46.49 $22.33 $68.82 WD →
Mason IL heavy $46.49 $22.33 $68.82 WD →
Mason IL highway $46.49 $22.33 $68.82 WD →
Massac IL heavy $46.49 $22.33 $68.82 WD →
Massac IL highway $46.49 $22.33 $68.82 WD →
Menard IL highway $46.49 $22.33 $68.82 WD →
Menard IL heavy $46.49 $22.33 $68.82 WD →
Monroe IL heavy $46.49 $22.33 $68.82 WD →
Monroe IL highway $46.49 $22.33 $68.82 WD →
Montgomery IL heavy $46.49 $22.33 $68.82 WD →
Montgomery IL highway $46.49 $22.33 $68.82 WD →
Morgan IL heavy $46.49 $22.33 $68.82 WD →
Morgan IL highway $46.49 $22.33 $68.82 WD →
Moultrie IL heavy $46.49 $22.33 $68.82 WD →
Moultrie IL highway $46.49 $22.33 $68.82 WD →
Perry IL highway $46.49 $22.33 $68.82 WD →
Perry IL heavy $46.49 $22.33 $68.82 WD →
Piatt IL highway $46.49 $22.33 $68.82 WD →
Piatt IL heavy $46.49 $22.33 $68.82 WD →
Pike IL heavy $46.49 $22.33 $68.82 WD →
Pike IL highway $46.49 $22.33 $68.82 WD →
Pope IL heavy $46.49 $22.33 $68.82 WD →
Pope IL highway $46.49 $22.33 $68.82 WD →
Pulaski IL heavy $46.49 $22.33 $68.82 WD →
Pulaski IL highway $46.49 $22.33 $68.82 WD →
Randolph IL highway $46.49 $22.33 $68.82 WD →
Randolph IL heavy $46.49 $22.33 $68.82 WD →
Richland IL highway $46.49 $22.33 $68.82 WD →
Richland IL heavy $46.49 $22.33 $68.82 WD →
Top-paying counties for LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD →