Wage Determination CA20260019-16366-res

Solano, CA · residential · Rev. 5 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination CA20260019-16366-res covers 291 trade classifications for residential construction in Solano, CA. Total packages (base + fringe) range from $35.58/hr to $140.49/hr, with the highest going to PLUMBER, STEAMFITTER, REFRIGERATION FITTER: NEW CONSTRUCTION IN SAN FRANCISCO COUNTY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: CA20260019-16366-res
Revision: 5
Type: residential
County: Solano
State: CA
Effective: May 17, 2026
Trades covered: 291
Highest rate: $140.49/hr
Official source: SAM.gov reference CA20260019View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTE: LABORERS WORKING OFF $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTE: LABORERS WORKING OFF $37.05 $27.30 $64.35 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF $34.56 $11.40 $45.96 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF $36.53 $9.27 $45.80 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $64.56 $25.07 $89.63 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $84.76 $25.07 $109.83 $0.00 $0.00 $0.00 $0.00
BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu $49.64 $28.56 $78.20 $0.00 $0.00 $0.00 $0.00
BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu $54.25 $28.56 $82.81 $0.00 $0.00 $0.00 $0.00
BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu $57.85 $28.56 $86.41 $0.00 $0.00 $0.00 $0.00
BRICK TENDER FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL $37.05 $27.45 $64.50 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SE $56.94 $26.28 $83.22 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES $52.76 $25.01 $77.77 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BAS $57.02 $28.50 $85.52 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: MONTEREY, SANTA CRUZ SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CO $54.18 $27.82 $82.00 $0.00 $0.00 $0.00 $0.00
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS $55.12 $24.30 $79.42 $0.00 $0.00 $0.00 $0.00
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS $47.93 $24.09 $72.02 $0.00 $0.00 $0.00 $0.00
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS $46.00 $25.68 $71.68 $0.00 $0.00 $0.00 $0.00
BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS $40.00 $25.50 $65.50 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $74.54 $36.09 $110.63 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $87.40 $49.41 $136.81 $0.00 $0.00 $0.00 $0.00
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY $52.80 $30.82 $83.62 $0.00 $0.00 $0.00 $0.00
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT MARIN COUNTY $52.75 $32.41 $85.16 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND IN $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $60.54 $33.52 $94.06 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $52.80 $30.82 $83.62 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $55.00 $31.49 $86.49 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER $49.12 $31.49 $80.61 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO, PLACER, SACRAMENTO AND YOL $54.66 $33.52 $88.18 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO, PLACER, SUTTER AND YUBA CO $53.31 $33.52 $86.83 $0.00 $0.00 $0.00 $0.00
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY $55.00 $31.49 $86.49 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $60.39 $33.52 $93.91 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $52.65 $30.82 $83.47 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER $48.97 $31.49 $80.46 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) $53.16 $33.52 $86.68 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGH $54.51 $33.52 $88.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER.$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR $60.54 $33.52 $94.06 $0.00 $0.00 $0.00 $0.00
CARPENTERS: JOURNEYMAN CARPENTER..$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR $49.12 $31.49 $80.61 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $60.49 $35.11 $95.60 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $52.75 $32.41 $85.16 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $54.95 $33.08 $88.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT $51.47 $33.08 $84.55 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) $55.66 $35.11 $90.77 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND $57.01 $35.11 $92.12 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT SOLANO COUNTY $54.95 $33.08 $88.03 $0.00 $0.00 $0.00 $0.00
CARPENTERS: MILLWRIGHT.$ 54.95 33.08 CARPENTERS: JOURNEYMAN CARPENTER $54.85 $31.49 $86.34 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.15 $23.27 $55.42 $0.00 $0.00 $0.00 $0.00
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S $37.08 $27.30 $64.38 $0.00 $0.00 $0.00 $0.00
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S $36.72 $27.30 $64.02 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR $42.79 $16.12 $58.91 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER: AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES $63.76 $32.69 $96.45 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER: AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES $59.63 $31.29 $90.92 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS: AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties $54.85 $31.93 $86.78 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS: AREA 2: Monterey, San Benito & Santa Cruz Counties $48.97 $31.93 $80.90 $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLERS/LATHERS: AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties $48.12 $31.93 $80.05 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER: AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties $27.43 $18.58 $46.01 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER: AREA 2: Monterey, San Benito & Santa Cruz Counties $24.49 $18.58 $43.07 $0.00 $0.00 $0.00 $0.00
DRYWALL STOCKER/SCRAPPER: AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties $24.07 $18.58 $42.65 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $37.58 $28.03 $65.61 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $35.11 $28.03 $63.14 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $54.69 $34.69 $89.38 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $56.71 $34.69 $91.40 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $57.79 $34.69 $92.48 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $58.88 $34.69 $93.57 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $60.15 $34.69 $94.84 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $61.36 $34.69 $96.05 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $62.69 $34.69 $97.38 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $64.09 $34.69 $98.78 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder $65.54 $34.69 $100.23 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $63.06 $34.69 $97.75 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $42.55 $31.15 $73.70 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $66.39 $34.69 $101.08 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $43.79 $31.15 $74.94 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $58.88 $34.69 $93.57 $0.00 $0.00 $0.00 $0.00
ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 $62.69 $34.69 $97.38 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.50 $21.16 $59.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $66.26 $35.84 $102.10 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.35 $23.49 $70.84 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $24.26 $65.26 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $76.00 $49.07 $125.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $86.00 $51.07 $137.07 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SING $55.50 $25.64 $81.14 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR $31.88 $8.46 $40.34 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: FOUR STORIES $39.06 $24.51 $63.57 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES $23.10 $12.48 $35.58 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ZONE B: ZONE B: ANY AREA OUTSIDE OF ZONE A $77.45 $33.97 $111.42 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA $84.05 $38.44 $122.49 $0.00 $0.00 $0.00 $0.00
GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNT $56.22 $34.00 $90.22 $0.00 $0.00 $0.00 $0.00
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSG $43.25 $35.62 $78.87 $0.00 $0.00 $0.00 $0.00
IRONWORKER: FENCE ERECTOR PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reser $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocol $50.70 $35.15 $85.85 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Rese $45.78 $26.51 $72.29 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Choco $55.33 $35.15 $90.48 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Choco $55.83 $35.15 $90.98 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-cont $39.15 $30.03 $69.18 $0.00 $0.00 $0.00 $0.00
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-cont $38.15 $30.03 $68.18 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $36.29 $25.55 $61.84 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL $36.84 $26.24 $63.08 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK MARIN COUNTY $37.54 $25.55 $63.09 $0.00 $0.00 $0.00 $0.00
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST $36.20 $27.30 $63.50 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' w $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' $37.20 $27.30 $64.50 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' $36.20 $27.30 $63.50 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAP $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG $35.72 $27.30 $63.02 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG $36.72 $27.30 $64.02 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes; Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewra $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEAN $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEAN $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 $37.46 $27.30 $64.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 $37.46 $27.30 $64.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo $36.96 $27.30 $64.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo $36.96 $27.30 $64.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo $35.96 $27.30 $63.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo $35.96 $27.30 $63.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOU $36.46 $27.30 $63.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR $37.46 $27.30 $64.76 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $35.96 $27.30 $63.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $36.96 $27.30 $64.26 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITION $35.37 $27.30 $62.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONA $36.37 $27.30 $63.67 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDI $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDIT $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 p $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0 $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 p $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING - AREA B: GROUP 2 : Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $ $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0 $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 1 Skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR A $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 1 Skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR AD $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0 $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS ): $0.25 PER $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: Laborers working off or with or fro $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION FOOTNOTE: Laborers working off or with or from bos'n chair $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: Laborers working off or with or fro $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION FOOTNOTE: Laborers working off or with or from bos'n chair $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N C $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGI $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGI $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N C $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER $77.35 $36.53 $113.88 $0.00 $0.00 $0.00 $0.00
LINE $70.41 $33.76 $104.17 $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $42.06 $19.80 $61.86 $0.00 $0.00 $0.00 $0.00
MARBLE MASON $61.72 $30.31 $92.03 $0.00 $0.00 $0.00 $0.00
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A $47.64 $28.56 $76.20 $0.00 $0.00 $0.00 $0.00
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A $52.25 $28.56 $80.81 $0.00 $0.00 $0.00 $0.00
MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A $55.85 $28.56 $84.41 $0.00 $0.00 $0.00 $0.00
MASON TENDER, BRICK $35.29 $26.85 $62.14 $0.00 $0.00 $0.00 $0.00
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CO $37.05 $27.45 $64.50 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $37.86 $28.03 $65.89 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $37.20 $28.03 $65.23 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $63.06 $34.69 $97.75 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $37.83 $28.03 $65.86 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $35.34 $28.03 $63.37 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $64.70 $34.69 $99.39 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $66.39 $34.69 $101.08 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $35.59 $28.03 $63.62 $0.00 $0.00 $0.00 $0.00
NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind $38.05 $28.03 $66.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter; Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7cu. yds. (EL DORADO $65.54 $34.69 $100.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat o $64.09 $34.69 $98.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu $61.36 $34.69 $96.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete p $60.15 $34.69 $94.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or si $57.79 $34.69 $92.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor; Compressor oper $56.71 $34.69 $91.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar; Mini excavator under 25 $54.69 $34.69 $89.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons $46.08 $31.15 $77.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cra $64.70 $34.69 $99.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cran $42.83 $31.15 $73.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu $45.07 $31.15 $76.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons a $44.44 $31.15 $75.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 4 $44.83 $31.15 $75.98 $0.00 $0.00 $0.00 $0.00
PAINTER $57.00 $28.04 $85.04 $0.00 $0.00 $0.00 $0.00
PAINTER FOOTNOTES: SPRAY WORK: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR $53.38 $28.04 $81.42 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR $39.43 $16.16 $55.59 $0.00 $0.00 $0.00 $0.00
PAINTER: PAPER HANGER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR SWI $42.19 $16.16 $58.35 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY PAINTER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR SW $41.43 $16.16 $57.59 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER L $43.45 $22.80 $66.25 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER $34.71 $17.62 $52.33 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO $40.83 $17.62 $58.45 $0.00 $0.00 $0.00 $0.00
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING $35.11 $17.62 $52.73 $0.00 $0.00 $0.00 $0.00
PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $41.93 $30.32 $72.25 $0.00 $0.00 $0.00 $0.00
PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $40.68 $29.68 $70.36 $0.00 $0.00 $0.00 $0.00
PLASTER TENDER Work on a swing stage scaffold: $1.00 per hour additional $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
PLASTERER $42.41 $30.73 $73.14 $0.00 $0.00 $0.00 $0.00
PLASTERER $36.73 $31.68 $68.41 $0.00 $0.00 $0.00 $0.00
PLASTERER $32.88 $31.68 $64.56 $0.00 $0.00 $0.00 $0.00
PLASTERER $32.70 $31.68 $64.38 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $39.77 $28.54 $68.31 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $40.68 $29.68 $70.36 $0.00 $0.00 $0.00 $0.00
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $41.93 $30.32 $72.25 $0.00 $0.00 $0.00 $0.00
PLUMBER $52.75 $41.39 $94.14 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $57.75 $43.60 $101.35 $0.00 $0.00 $0.00 $0.00
PLUMBER & STEAMFITTER $80.50 $50.45 $130.95 $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER $43.72 $20.29 $64.01 $0.00 $0.00 $0.00 $0.00
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: NEW CONSTRUCTION IN SAN FRANCISCO COUNTY $91.00 $49.49 $140.49 $0.00 $0.00 $0.00 $0.00
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties $82.00 $48.18 $130.18 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER/STEAMFITTER $87.75 $41.44 $129.19 $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $30.90 $7.90 $38.80 $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $55.58 $24.02 $79.60 $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER COUNTIES) $52.14 $18.71 $70.85 $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS FOOTNOTES: WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL $37.35 $21.15 $58.50 $0.00 $0.00 $0.00 $0.00
ROOFER $55.30 $22.97 $78.27 $0.00 $0.00 $0.00 $0.00
ROOFER $54.94 $23.34 $78.28 $0.00 $0.00 $0.00 $0.00
ROOFER $46.73 $21.36 $68.09 $0.00 $0.00 $0.00 $0.00
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER $57.17 $21.51 $78.68 $0.00 $0.00 $0.00 $0.00
ROOFER: JOURNEYMAN $53.17 $21.51 $74.68 $0.00 $0.00 $0.00 $0.00
ROOFER: KETTLE PERSON $55.17 $21.51 $76.68 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.29 $16.41 $46.70 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA $67.03 $50.79 $117.82 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: AREA 2: MONTEREY & SAN BENITO $60.64 $39.04 $99.68 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: AREA 3: SANTA CRUZ $55.16 $34.18 $89.34 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $59.00 $33.03 $92.03 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $34.27 $16.47 $50.74 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $48.54 $26.59 $75.13 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS, INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $56.68 $28.35 $85.03 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $58.83 $31.51 $90.34 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $53.08 $30.84 $83.92 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT $58.33 $31.00 $89.33 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $67.65 $31.78 $99.43 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $61.04 $31.08 $92.12 $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O $67.08 $31.26 $98.34 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.82 $18.05 $67.87 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $49.69 $29.72 $79.41 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $52.06 $29.86 $81.92 $0.00 $0.00 $0.00 $0.00
TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR $44.21 $34.28 $78.49 $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL $44.93 $20.98 $65.91 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL $60.58 $29.79 $90.37 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $35.78 $19.23 $55.01 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $35.00 $17.44 $52.44 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $37.75 $19.28 $57.03 $0.00 $0.00 $0.00 $0.00
TILE LAYER $56.79 $22.54 $79.33 $0.00 $0.00 $0.00 $0.00
TILE LAYER $55.55 $21.08 $76.63 $0.00 $0.00 $0.00 $0.00
TILE LAYER $59.92 $22.62 $82.54 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TRUCK; CONCRETE PUMP MACHINE; FORK LIFT AND LIFT $43.26 $34.28 $77.54 $0.00 $0.00 $0.00 $0.00
TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA $44.56 $34.28 $78.84 $0.00 $0.00 $0.00 $0.00
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER $36.01 $18.50 $54.51 $0.00 $0.00 $0.00 $0.00
UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION $43.56 $34.28 $77.84 $0.00 $0.00 $0.00 $0.00
WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL $43.86 $34.28 $78.14 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $37.05 $27.30 $64.35 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL $36.72 $27.30 $64.02 $0.00 $0.00 $0.00 $0.00
WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR T $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker includi $35.50 $27.30 $62.80 $0.00 $0.00 $0.00 $0.00
Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker includi $36.50 $27.30 $63.80 $0.00 $0.00 $0.00 $0.00
and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; J $35.25 $27.30 $62.55 $0.00 $0.00 $0.00 $0.00
and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; J $36.25 $27.30 $63.55 $0.00 $0.00 $0.00 $0.00
building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner; material cleaner. The classification ""material cl $28.94 $27.30 $56.24 $0.00 $0.00 $0.00 $0.00
building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner; material cleaner. The classification ""material cl $29.94 $27.30 $57.24 $0.00 $0.00 $0.00 $0.00
grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; pressure pipe tester; No joint pipe an $36.70 $27.30 $64.00 $0.00 $0.00 $0.00 $0.00
guniting or shot crete FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional $36.08 $27.30 $63.38 $0.00 $0.00 $0.00 $0.00
guniting or shot crete FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleane $37.08 $27.30 $64.38 $0.00 $0.00 $0.00 $0.00
handling dry cement or gypsum; Choke-setter and rigger; Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer; Driller te $35.35 $27.30 $62.65 $0.00 $0.00 $0.00 $0.00
handling dry cement or gypsum; Choke-setter and rigger; Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer; Driller te $36.35 $27.30 $63.65 $0.00 $0.00 $0.00 $0.00
laborers' work; Synthetic thermoplastics and similar type welding FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, bel $35.55 $27.30 $62.85 $0.00 $0.00 $0.00 $0.00
laborers' work; Synthetic thermoplastics and similar type welding FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, bel $36.55 $27.30 $63.85 $0.00 $0.00 $0.00 $0.00
model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of po $35.72 $27.30 $63.02 $0.00 $0.00 $0.00 $0.00
model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of po $36.72 $27.30 $64.02 $0.00 $0.00 $0.00 $0.00
shafts thereof, and work on and in deep footings. In the event the depth of the footing is unknown at the commencement of excavation, and the final de $36.05 $27.30 $63.35 $0.00 $0.00 $0.00 $0.00
shafts thereof, and work on and in deep footings. In the event the depth of the footing is unknown at the commencement of excavation, and the final de $37.05 $27.30 $64.35 $0.00 $0.00 $0.00 $0.00
View all WDs for Solano → Revision history →