TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING — Prevailing Wage Rates
Davis-Bacon prevailing wages for TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADINGs across all covered states and counties. Rates vary by location and construction type.
Across 125 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING is $72.68/hr, with the middle 80% of counties paying between $72.68 and $72.68/hr. The highest state average is California at $72.68/hr; the lowest is California at $72.68/hr.
Range: $72.68 – $72.68/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
125 county-level rates for TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Sonoma | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Sonoma | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Stanislaus | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Stanislaus | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Stanislaus | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Sutter | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Sutter | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Sutter | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Tehama | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Tehama | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Tehama | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Trinity | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Trinity | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Trinity | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Tulare | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Tulare | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Tuolumne | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Tuolumne | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Tuolumne | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Yolo | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Yolo | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Yolo | CA | building | $44.96 | $27.72 | $72.68 | WD → |
| Yuba | CA | highway | $44.96 | $27.72 | $72.68 | WD → |
| Yuba | CA | heavy | $44.96 | $27.72 | $72.68 | WD → |
| Yuba | CA | building | $44.96 | $27.72 | $72.68 | WD → |