POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 55 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP is $68.61/hr, with the middle 80% of counties paying between $68.61 and $68.61/hr. The highest state average is West Virginia at $68.61/hr; the lowest is West Virginia at $68.61/hr.

Bottom 10%
$68.61
Median
$68.61
Average
$68.61
Top 10%
$68.61

Range: $68.61 – $68.61/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$68.61/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+143%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

West Virginia WV
Avg base: $46.56/hr
Avg total: $68.61/hr
55 rates

All Rates

55 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Barbour WV building $46.56 $22.05 $68.61 WD →
Berkeley WV building $46.56 $22.05 $68.61 WD →
Boone WV building $46.56 $22.05 $68.61 WD →
Braxton WV building $46.56 $22.05 $68.61 WD →
Brooke WV building $46.56 $22.05 $68.61 WD →
Cabell WV building $46.56 $22.05 $68.61 WD →
Calhoun WV building $46.56 $22.05 $68.61 WD →
Clay WV building $46.56 $22.05 $68.61 WD →
Doddridge WV building $46.56 $22.05 $68.61 WD →
Fayette WV building $46.56 $22.05 $68.61 WD →
Gilmer WV building $46.56 $22.05 $68.61 WD →
Grant WV building $46.56 $22.05 $68.61 WD →
Greenbrier WV building $46.56 $22.05 $68.61 WD →
Hampshire WV building $46.56 $22.05 $68.61 WD →
Hancock WV building $46.56 $22.05 $68.61 WD →
Hardy WV building $46.56 $22.05 $68.61 WD →
Harrison WV building $46.56 $22.05 $68.61 WD →
Jackson WV building $46.56 $22.05 $68.61 WD →
Jefferson WV building $46.56 $22.05 $68.61 WD →
Kanawha WV building $46.56 $22.05 $68.61 WD →
Lewis WV building $46.56 $22.05 $68.61 WD →
Lincoln WV building $46.56 $22.05 $68.61 WD →
Logan WV building $46.56 $22.05 $68.61 WD →
Marion WV building $46.56 $22.05 $68.61 WD →
Marshall WV building $46.56 $22.05 $68.61 WD →
Mason WV building $46.56 $22.05 $68.61 WD →
McDowell WV building $46.56 $22.05 $68.61 WD →
Mercer WV building $46.56 $22.05 $68.61 WD →
Mineral WV building $46.56 $22.05 $68.61 WD →
Mingo WV building $46.56 $22.05 $68.61 WD →
Monongalia WV building $46.56 $22.05 $68.61 WD →
Monroe WV building $46.56 $22.05 $68.61 WD →
Morgan WV building $46.56 $22.05 $68.61 WD →
Nicholas WV building $46.56 $22.05 $68.61 WD →
Ohio WV building $46.56 $22.05 $68.61 WD →
Pendleton WV building $46.56 $22.05 $68.61 WD →
Pleasants WV building $46.56 $22.05 $68.61 WD →
Pocahontas WV building $46.56 $22.05 $68.61 WD →
Preston WV building $46.56 $22.05 $68.61 WD →
Putnam WV building $46.56 $22.05 $68.61 WD →
Raleigh WV building $46.56 $22.05 $68.61 WD →
Randolph WV building $46.56 $22.05 $68.61 WD →
Ritchie WV building $46.56 $22.05 $68.61 WD →
Roane WV building $46.56 $22.05 $68.61 WD →
Summers WV building $46.56 $22.05 $68.61 WD →
Taylor WV building $46.56 $22.05 $68.61 WD →
Tucker WV building $46.56 $22.05 $68.61 WD →
Tyler WV building $46.56 $22.05 $68.61 WD →
Upshur WV building $46.56 $22.05 $68.61 WD →
Wayne WV building $46.56 $22.05 $68.61 WD →
Webster WV building $46.56 $22.05 $68.61 WD →
Wetzel WV building $46.56 $22.05 $68.61 WD →
Wirt WV building $46.56 $22.05 $68.61 WD →
Wood WV building $46.56 $22.05 $68.61 WD →
Wyoming WV building $46.56 $22.05 $68.61 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP →