Wage Determination WV20260018-17708-bld
Mercer, WV · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination WV20260018-17708-bld covers 50 trade classifications for building construction in Mercer, WV. Total packages (base + fringe) range from $29.76/hr to $76.06/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: WV20260018-17708-bld
Revision: 1
Type: building
County: Mercer
State: WV
Effective: May 17, 2026
Trades covered: 50
Highest rate: $76.06/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 | $57.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $27.50 | $12.35 | $39.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.00 | $21.15 | $51.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.03 | $23.65 | $53.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $25.08 | $12.58 | $37.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $29.81 | $23.45 | $53.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.73 | $23.71 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $32.89 | $13.38 | $46.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $26.01 | $12.18 | $38.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.02 | $16.80 | $44.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $25.79 | $16.19 | $41.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.04 | $16.35 | $40.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.34 | $16.41 | $40.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.35 | $16.20 | $40.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $23.63 | $16.43 | $40.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.24 | $16.27 | $40.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.29 | $16.27 | $40.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.78 | $16.25 | $41.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $24.19 | $16.23 | $40.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement, Bobcat Operator, Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 (Concrete Saw, Grouting) | $31.97 | $25.36 | $57.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $22.76 | $16.75 | $39.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $22.76 | $16.75 | $39.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUTING | $22.76 | $16.75 | $39.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $33.00 | $26.18 | $59.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 | $41.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 | $31.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $24.13 | $16.05 | $40.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $36.58 | $24.58 | $61.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP | $46.56 | $22.05 | $68.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $24.28 | $9.32 | $33.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $32.07 | $27.52 | $59.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 | $31.52 | $0.00 | $0.00 | $0.00 | $0.00 |