Wage Determination WV20260023-17806-bld

Raleigh, WV · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination WV20260023-17806-bld covers 43 trade classifications for building construction in Raleigh, WV. Total packages (base + fringe) range from $29.33/hr to $78.63/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: WV20260023-17806-bld
Revision: 1
Type: building
County: Raleigh
State: WV
Effective: May 17, 2026
Trades covered: 43
Highest rate: $78.63/hr
Official source: SAM.gov reference WV20260023View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.05 $30.87 $68.92 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $31.65 $25.56 $57.21 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $26.78 $2.55 $29.33 $0.00 $0.00 $0.00 $0.00
CARPENTER $33.84 $25.51 $59.35 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.52 $22.34 $54.86 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.73 $23.71 $66.44 $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.19 $25.66 $60.85 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.10 $24.65 $60.75 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.10 $24.65 $60.75 $0.00 $0.00 $0.00 $0.00
LABORER $28.02 $16.80 $44.82 $0.00 $0.00 $0.00 $0.00
LABORER $23.33 $16.04 $39.37 $0.00 $0.00 $0.00 $0.00
LABORER $23.63 $16.13 $39.76 $0.00 $0.00 $0.00 $0.00
LABORER $24.06 $16.31 $40.37 $0.00 $0.00 $0.00 $0.00
LABORER $23.35 $16.07 $39.42 $0.00 $0.00 $0.00 $0.00
LABORER $22.99 $16.35 $39.34 $0.00 $0.00 $0.00 $0.00
LABORER $22.70 $16.15 $38.85 $0.00 $0.00 $0.00 $0.00
LABORER $23.57 $16.19 $39.76 $0.00 $0.00 $0.00 $0.00
LABORER $24.78 $16.25 $41.03 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement, Bobcat Operator, Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (Concrete Saw, Grouting) $31.97 $25.36 $57.33 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY $25.41 $16.75 $42.16 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION $22.76 $16.75 $39.51 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $21.47 $8.29 $29.76 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.05 $8.54 $30.59 $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.00 $26.18 $59.18 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $30.24 $10.26 $40.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $30.31 $10.81 $41.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.09 $3.00 $36.09 $0.00 $0.00 $0.00 $0.00
PAINTER $30.85 $17.80 $48.65 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $27.64 $18.09 $45.73 $0.00 $0.00 $0.00 $0.00
PLASTERER $24.13 $16.05 $40.18 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $37.63 $78.63 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES $45.21 $22.05 $67.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER $34.71 $22.05 $56.76 $0.00 $0.00 $0.00 $0.00
ROOFER $24.28 $9.32 $33.60 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $32.07 $27.52 $59.59 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS $28.52 $3.00 $31.52 $0.00 $0.00 $0.00 $0.00
View all WDs for Raleigh → Revision history →