Wage Determination WV20260045-17847-bld
Pleasants, WV · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination WV20260045-17847-bld covers 28 trade classifications for building construction in Pleasants, WV. Total packages (base + fringe) range from $40.71/hr to $78.63/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: WV20260045-17847-bld
Revision: 1
Type: building
County: Pleasants
State: WV
Effective: May 17, 2026
Trades covered: 28
Highest rate: $78.63/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.50 | $22.17 | $52.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $33.05 | $26.50 | $59.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $39.01 | $30.75 | $69.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $32.89 | $13.38 | $46.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $25.72 | $16.50 | $42.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.02 | $16.80 | $44.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: AIRTOOL OPERATOR, BOBCAT OPERATOR, CARPENTER TENDER, CHIPPING GUNS, COMMON OR GENERAL, CONCRETE SAW, CONCRETE WORKER, DEMOLITION, FENCE ERECT | $23.76 | $16.95 | $40.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CHAIN SAW OPERATOR | $23.83 | $16.95 | $40.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MOTORIZED BUGGY OPERATOR | $23.83 | $16.95 | $40.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $31.65 | $25.56 | $57.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $30.57 | $20.06 | $50.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $31.48 | $17.73 | $49.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.00 | $37.63 | $78.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.00 | $37.63 | $78.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP | $46.56 | $22.05 | $68.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $29.75 | $16.71 | $46.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $33.53 | $26.71 | $60.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $27.00 | $22.57 | $49.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $31.65 | $25.56 | $57.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK, TRACTOR HAUL TRUCK, WATER TANK TRUCK..$ 29.96 22.50 TRUCK DRIVER: GROUP 2 DUMP TRUCK, WATER TANK TRUCK | $29.81 | $22.50 | $52.31 | $0.00 | $0.00 | $0.00 | $0.00 |