Wage Determination WV20260032-17617-bld

Wetzel, WV · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination WV20260032-17617-bld covers 27 trade classifications for building construction in Wetzel, WV. Total packages (base + fringe) range from $31.52/hr to $76.06/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: WV20260032-17617-bld
Revision: 1
Type: building
County: Wetzel
State: WV
Effective: May 17, 2026
Trades covered: 27
Highest rate: $76.06/hr
Official source: SAM.gov reference WV20260032View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.70 $25.93 $57.63 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.77 $27.72 $71.49 $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.19 $25.66 $60.85 $0.00 $0.00 $0.00 $0.00
LABORER $24.13 $16.20 $40.33 $0.00 $0.00 $0.00 $0.00
LABORER $24.45 $16.41 $40.86 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $25.92 $16.88 $42.80 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.92 $16.88 $42.80 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CARPENTER TENDER, WATER BOY $24.13 $16.05 $40.18 $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 CONCRETE WORKER, DEWATERING, GRADE CHECKER, MASON TENDER-BRICK, MORTAR MIXER, RIGGING AND SIGNALING, SCAFFOLD BUILDER, SKYTRAK FORKLI $24.13 $16.05 $40.18 $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.00 $26.18 $59.18 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.09 $3.00 $36.09 $0.00 $0.00 $0.00 $0.00
PAINTER $29.47 $18.72 $48.19 $0.00 $0.00 $0.00 $0.00
PAINTER $26.36 $17.68 $44.04 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.10 $29.06 $65.16 $0.00 $0.00 $0.00 $0.00
PLUMBER $34.05 $41.05 $75.10 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, EXCAVATOR, BULLDOZER, ALL OTHER CRANES $45.21 $22.05 $67.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, OILER $34.71 $22.05 $56.76 $0.00 $0.00 $0.00 $0.00
ROOFER $24.28 $9.32 $33.60 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.92 $29.70 $64.62 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.26 $28.90 $72.16 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS $28.52 $3.00 $31.52 $0.00 $0.00 $0.00 $0.00
View all WDs for Wetzel → Revision history →