OPERATOR: Power Equipment Leverman — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: Power Equipment Levermans across all covered states and counties. Rates vary by location and construction type.
Quick Answer
Across 37 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: Power Equipment Leverman is $108.85/hr, with the middle 80% of counties paying between $108.85 and $108.85/hr. The highest state average is California at $108.85/hr; the lowest is California at $108.85/hr.
Bottom 10%
$108.85
Median
$108.85
Average
$108.85
Top 10%
$108.85
Range: $108.85 – $108.85/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
37 county-level rates for OPERATOR: Power Equipment Leverman, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Imperial | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Imperial | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Imperial | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Inyo | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Inyo | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Inyo | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Kern | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Kern | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Kern | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Los Angeles | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Los Angeles | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Los Angeles | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Mono | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Mono | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Mono | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Orange | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Orange | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Orange | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Riverside | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Riverside | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Riverside | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| San Bernardino | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| San Bernardino | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| San Bernardino | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| San Diego | CA | residential | $67.90 | $40.95 | $108.85 | WD → |
| San Diego | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| San Diego | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| San Diego | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| San Luis Obispo | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| San Luis Obispo | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| San Luis Obispo | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Santa Barbara | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |
| Santa Barbara | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Santa Barbara | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Ventura | CA | highway | $67.90 | $40.95 | $108.85 | WD → |
| Ventura | CA | building | $67.90 | $40.95 | $108.85 | WD → |
| Ventura | CA | heavy | $67.90 | $40.95 | $108.85 | WD → |