OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5s across all covered states and counties. Rates vary by location and construction type.
Across 14 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5 is $64.82/hr, with the middle 80% of counties paying between $64.82 and $64.82/hr. The highest state average is Michigan at $64.82/hr; the lowest is Michigan at $64.82/hr.
Range: $64.82 – $64.82/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
14 county-level rates for OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.5, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Bay | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Berrien | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Calhoun | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Cass | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Clinton | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Eaton | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Genesee | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Ingham | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Jackson | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Kalamazoo | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Lapeer | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Livingston | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Saginaw | MI | building | $39.57 | $25.25 | $64.82 | WD → |
| Van Buren | MI | building | $39.57 | $25.25 | $64.82 | WD → |