LINE CONSTRUCTION Lineman; Cable splicer..$ 70.16 24.71 Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trencher — Prevailing Wage Rates
Davis-Bacon prevailing wages for LINE CONSTRUCTION Lineman; Cable splicer..$ 70.16 24.71 Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers across all covered states and counties. Rates vary by location and construction type.
Across 167 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION Lineman; Cable splicer..$ 70.16 24.71 Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trencher is $75.56/hr, with the middle 80% of counties paying between $75.56 and $75.56/hr. The highest state average is California at $75.56/hr; the lowest is California at $75.56/hr.
Range: $75.56 – $75.56/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051 — Electrical Power-Line Installers and Repairers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
167 county-level rates for LINE CONSTRUCTION Lineman; Cable splicer..$ 70.16 24.71 Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trencher, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Alameda | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Alameda | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Alameda | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Alpine | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Alpine | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Alpine | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Amador | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Amador | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Amador | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Butte | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Butte | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Butte | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Calaveras | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Calaveras | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Calaveras | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Colusa | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Colusa | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Colusa | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Contra Costa | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Contra Costa | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Contra Costa | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Del Norte | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Del Norte | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| El Dorado | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| El Dorado | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| El Dorado | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Fresno | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Fresno | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Fresno | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Glenn | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Glenn | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Glenn | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Humboldt | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Humboldt | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Imperial | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Imperial | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Imperial | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Inyo | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Inyo | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Inyo | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Kern | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Kern | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Kern | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Kings | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Kings | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Kings | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Lake | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Lake | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Lassen | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Lassen | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Lassen | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Los Angeles | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Los Angeles | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Los Angeles | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Madera | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Madera | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Madera | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Marin | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Marin | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Marin | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Mariposa | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Mariposa | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Mariposa | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Mendocino | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Mendocino | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Merced | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Merced | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Merced | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Modoc | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Modoc | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Modoc | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Mono | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Mono | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Mono | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Monterey | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Monterey | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Monterey | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Napa | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Napa | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Napa | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Nevada | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Nevada | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Nevada | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Orange | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Orange | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Orange | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Placer | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Placer | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Placer | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Plumas | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Plumas | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Plumas | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Riverside | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| Riverside | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Riverside | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Sacramento | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |
| Sacramento | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| Sacramento | CA | highway | $53.30 | $22.26 | $75.56 | WD → |
| San Benito | CA | building | $53.30 | $22.26 | $75.56 | WD → |
| San Benito | CA | heavy | $53.30 | $22.26 | $75.56 | WD → |