Residential Construction — Cascade, Montana
WD MT20260018-17840-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Cascade, Montana (construction type: residential) is $17.00/hr base + $2.70/hr fringe = $19.70/hr total package (WD MT20260018-17840-res, Rev. 1).
Scroll down for all 19 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $17.00 | $2.70 | $19.70 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $13.15 | $3.31 | $16.46 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.30 | $1.00 | $13.30 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $15.90 | $2.01 | $17.91 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET | $12.50 | $0.00 | $12.50 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $17.18 | $6.18 | $23.36 Bottom 10% -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PIPELAYER, HOD CARRIER | $10.66 | $1.75 | $12.41 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: UNSKILLED | $10.50 | $1.75 | $12.25 Above median -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH | $12.42 | $1.21 | $13.63 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY | $14.67 | $1.24 | $15.91 Bottom 10% -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $16.20 | $2.17 | $18.37 -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $11.40 | $1.20 | $12.60 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $15.19 | $1.82 | $17.01 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $14.81 | $2.43 | $17.24 Bottom 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO & TILE SETTER | $14.45 | $1.45 | $15.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS, FLATBED | $11.20 | $1.66 | $12.86 -55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: COMBINATION TRUCK, CONCRETE MIXER, TRANSIT MIXER | $11.10 | $1.66 | $12.76 -55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: FLATBED | $11.00 | $1.66 | $12.66 Above median -55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: PICKUP | $10.95 | $1.66 | $12.61 Above median -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Cascade, MT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Cascade, Montana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.