Heavy Construction — Cascade, Montana

WD MT20260066-17840-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Cascade, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260066-17840-hvy, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MT20260066-17840-hvy
Revision: 1
Construction Type: heavy
State: Montana (MT)
County: Cascade
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MT20260066View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 Above median $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $23.47 $10.40 $33.87 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FRO $36.49 $14.33 $50.82 +82% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.51 $17.09 $55.60 +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT ROLLER $22.39 $3.96 $26.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $21.99 $8.55 $30.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.67 $8.05 $33.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.67 $6.54 $29.21 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $25.00 $0.00 $25.00 +6% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $46.45 $19.92 $66.37 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: EXCAVATOR, CRANE OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJ $23.94 $10.40 $34.34 +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: MECHANIC, SCRAPER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $24.34 $10.40 $34.74 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1:CRANES, 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1:CRANES, 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 +95% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER WATER TRUCK ZONE A. ZONE B: ADD $3.05 PER HOUR TO ZONE A RATES ZONE C: ADD $4.85 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED F $32.88 $13.98 $46.86 +65% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.38 $4.74 $24.12 Above median -15% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cascade, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cascade

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260066-17840-hvy →