Highway Construction — Cascade, Montana

WD MT20260080-17840-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER: Carpenter in Cascade, Montana (construction type: highway) is $36.49/hr base + $14.33/hr fringe = $50.82/hr total package (WD MT20260080-17840-hwy, Rev. 2).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: MT20260080-17840-hwy
Revision: 2
Construction Type: highway
State: Montana (MT)
County: Cascade
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference MT20260080View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER: Carpenter $36.49 $14.33 $50.82 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: Millwright $40.45 $21.25 $61.70 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.41 $16.51 $49.92 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
DIVER: Diver Tender $45.30 $18.38 $63.68 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: Diving $92.66 $18.38 $111.04 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: Standy-By $46.33 $18.38 $64.71 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.08 $20.00 $59.08 +78% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Reinforcing Iron and Rebar Workers $34.83 $25.37 $60.20 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Structural Iron and Steel Workers $30.43 $25.22 $55.65 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER: Group 1 Flag Person for Traffic Control $27.71 $12.80 $40.51 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: Group 2 General Labor; Asbestos Removal; Burning Bar; Bucket Man; Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler; Chuc $30.87 $12.36 $43.23 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER: Group 3 Concrete Vibrator; Dumpman; Equipment Handler; Geotextile and Liners; High-Pressure Nozzleman; Jackhammer Non-Riding Rollers; Pipelay $31.10 $12.36 $43.46 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER: Group 4 Hod Carrier; Water Well Laborer; Blaster; Wagon Driller; Asphalt Raker; Cutting Torch; Grade Setter; High- Scaler; Power Saws; Powder $32.12 $12.36 $44.48 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Equipment Operator $38.38 $18.60 $56.98 Top 10% +10% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Groundman $29.96 $17.64 $47.60 Top 10% -8% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Lineman $50.11 $19.88 $69.99 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $36.00 $12.84 $48.84 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PILE BUCKS $36.49 $14.33 $50.82 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 1 Air Compressor; Auto Fine Graders; Belt Finishing; Boring Machine; Cement Silo; Crane, A-Frame Truck Crane; Crusher $32.47 $12.77 $45.24 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 2 Air Doctor; Backhoe/Excavator/Shovel up to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Bor $34.55 $12.77 $47.32 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 3 Asphalt Paving Machine; Asphalt Screed; Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline; Concrete Batch P $35.70 $12.77 $48.47 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 4 Asphalt/Hot Plant Operator, Cranes, 25 Tons up to and incl. 44 Tons; Crusher Operator; Finish Motor Patrol; Finish S $36.91 $12.77 $49.68 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 5 Cranes, 45 Tons up to and incl. 74 Tons $38.05 $12.77 $50.82 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 6 Cranes, 75 Tons up to and incl. 149 Tons; Crane, Whirley $39.27 $12.77 $52.04 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 7 Cranes, 150 Tons up to and incl. 250 Tons; Cranes, over 250 tons-add $1.00 for every 100 tons over 250 tons; Crane $41.95 $12.77 $54.72 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 1 Pilot Car $28.21 $12.57 $40.78 Top 10% +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 2 Combination Truck and Concrete Mixer and Transit Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump Trucks and Similar E $35.74 $12.57 $48.31 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cascade, MT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cascade

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260080-17840-hwy →