Davis-Bacon Wage Determinations — Cascade, Montana

Cascade has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Cascade, Montana cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MT20260062-17840-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MT20260066-17840-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MT20260080-17840-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential Active
WD: MT20260018-17840-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Cascade

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELECTRICIAN building $23.90 $160.74 $184.64 WD →
2 DIVER: Diving highway $92.66 $18.38 $111.04 WD →
3 DIVER Diving highway $92.66 $18.38 $111.04 WD →
4 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME building $67.61 $38.44 $106.05 WD →
5 BOILERMAKER building $38.75 $32.31 $71.06 WD →
6 LINE CONSTRUCTION: Lineman highway $50.11 $19.88 $69.99 WD →
7 LINE CONSTRUCTION Lineman highway $50.11 $19.88 $69.99 WD →
8 PLUMBER heavy $46.45 $19.92 $66.37 WD →
9 PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION building $46.45 $19.92 $66.37 WD →
10 PIPEFITTER, Excludes HVAC Pipe Installation building $46.45 $19.92 $66.37 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →