Building Construction — Cascade, Montana

WD MT20260062-17840-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 3: OVER 60 MILES - $6.00 in Cascade, Montana (construction type: building) is $32.05/hr base + $15.02/hr fringe = $47.07/hr total package (WD MT20260062-17840-bld, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: MT20260062-17840-bld
Revision: 1
Construction Type: building
State: Montana (MT)
County: Cascade
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference MT20260062View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
3: OVER 60 MILES - $6.00 $32.05 $15.02 $47.07 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $32.88 $16.20 $49.08 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $17.18 $50.29 +61% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.90 $160.74 $184.64 Top 10% +457% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.62 $5.02 $19.64 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $20.56 $6.35 $26.91 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $26.39 $19.39 $45.78 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $17.00 $0.00 $17.00 -28% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $46.45 $19.92 $66.37 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $46.45 $19.92 $66.37 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO $31.51 $16.20 $47.71 +65% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.68 $2.12 $16.80 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.07 $22.07 $62.14 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME $67.61 $38.44 $106.05 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cascade, MT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cascade

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260062-17840-bld →