OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL — Prevailing Wage Rates
Davis-Bacon prevailing wages for OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PILs across all covered states and counties. Rates vary by location and construction type.
Across 44 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL is $92.28/hr, with the middle 80% of counties paying between $91.13 and $93.43/hr. The highest state average is New York at $92.28/hr; the lowest is New York at $92.28/hr.
Range: $91.13 – $93.43/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
44 county-level rates for OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Allegany | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Allegany | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Chemung | NY | building | $55.38 | $35.75 | $91.13 | WD → |
| Chemung | NY | building | $58.43 | $35.00 | $93.43 | WD → |
| Chemung | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Chemung | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Chemung | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Chemung | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Genesee | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Genesee | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Genesee | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Genesee | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Livingston | NY | building | $58.43 | $35.00 | $93.43 | WD → |
| Livingston | NY | building | $55.38 | $35.75 | $91.13 | WD → |
| Livingston | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Livingston | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Livingston | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Livingston | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Monroe | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Monroe | NY | building | $55.38 | $35.75 | $91.13 | WD → |
| Monroe | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Monroe | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Monroe | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Monroe | NY | building | $58.43 | $35.00 | $93.43 | WD → |
| Ontario | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Ontario | NY | building | $58.43 | $35.00 | $93.43 | WD → |
| Ontario | NY | building | $55.38 | $35.75 | $91.13 | WD → |
| Ontario | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Ontario | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Ontario | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Schuyler | NY | building | $55.38 | $35.75 | $91.13 | WD → |
| Schuyler | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Schuyler | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Schuyler | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Schuyler | NY | building | $58.43 | $35.00 | $93.43 | WD → |
| Schuyler | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Steuben | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Steuben | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Wayne | NY | highway | $58.43 | $35.00 | $93.43 | WD → |
| Wayne | NY | heavy | $55.38 | $35.75 | $91.13 | WD → |
| Wayne | NY | heavy | $58.43 | $35.00 | $93.43 | WD → |
| Wayne | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Yates | NY | highway | $55.38 | $35.75 | $91.13 | WD → |
| Yates | NY | highway | $58.43 | $35.00 | $93.43 | WD → |