OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRYs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 22 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY is $76.11/hr, with the middle 80% of counties paying between $76.11 and $76.11/hr. The highest state average is New York at $77.39/hr; the lowest is New York at $77.39/hr.

Bottom 10%
$76.11
Median
$76.11
Average
$77.39
Top 10%
$76.11

Range: $76.11 – $90.23/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$76.11/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+169.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $42.54/hr
Avg total: $77.39/hr
22 rates

All Rates

22 county-level rates for OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allegany NY highway $41.26 $34.85 $76.11 WD →
Chemung NY heavy $41.26 $34.85 $76.11 WD →
Chemung NY building $41.26 $34.85 $76.11 WD →
Chemung NY highway $41.26 $34.85 $76.11 WD →
Genesee NY heavy $55.38 $34.85 $90.23 WD →
Genesee NY highway $55.38 $34.85 $90.23 WD →
Livingston NY building $41.26 $34.85 $76.11 WD →
Livingston NY heavy $41.26 $34.85 $76.11 WD →
Livingston NY highway $41.26 $34.85 $76.11 WD →
Monroe NY building $41.26 $34.85 $76.11 WD →
Monroe NY heavy $41.26 $34.85 $76.11 WD →
Monroe NY highway $41.26 $34.85 $76.11 WD →
Ontario NY building $41.26 $34.85 $76.11 WD →
Ontario NY highway $41.26 $34.85 $76.11 WD →
Ontario NY heavy $41.26 $34.85 $76.11 WD →
Schuyler NY heavy $41.26 $34.85 $76.11 WD →
Schuyler NY highway $41.26 $34.85 $76.11 WD →
Schuyler NY building $41.26 $34.85 $76.11 WD →
Steuben NY highway $41.26 $34.85 $76.11 WD →
Wayne NY highway $41.26 $34.85 $76.11 WD →
Wayne NY heavy $41.26 $34.85 $76.11 WD →
Yates NY highway $41.26 $34.85 $76.11 WD →
Top-paying counties for OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY →