OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DRs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 22 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR is $92.21/hr, with the middle 80% of counties paying between $92.21 and $92.21/hr. The highest state average is New York at $92.21/hr; the lowest is New York at $92.21/hr.

Bottom 10%
$92.21
Median
$92.21
Average
$92.21
Top 10%
$92.21

Range: $92.21 – $92.21/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$92.21/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+226.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $57.21/hr
Avg total: $92.21/hr
22 rates

All Rates

22 county-level rates for OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allegany NY highway $57.21 $35.00 $92.21 WD →
Chemung NY heavy $57.21 $35.00 $92.21 WD →
Chemung NY building $57.21 $35.00 $92.21 WD →
Chemung NY highway $57.21 $35.00 $92.21 WD →
Genesee NY heavy $57.21 $35.00 $92.21 WD →
Genesee NY highway $57.21 $35.00 $92.21 WD →
Livingston NY building $57.21 $35.00 $92.21 WD →
Livingston NY heavy $57.21 $35.00 $92.21 WD →
Livingston NY highway $57.21 $35.00 $92.21 WD →
Monroe NY building $57.21 $35.00 $92.21 WD →
Monroe NY heavy $57.21 $35.00 $92.21 WD →
Monroe NY highway $57.21 $35.00 $92.21 WD →
Ontario NY building $57.21 $35.00 $92.21 WD →
Ontario NY highway $57.21 $35.00 $92.21 WD →
Ontario NY heavy $57.21 $35.00 $92.21 WD →
Schuyler NY heavy $57.21 $35.00 $92.21 WD →
Schuyler NY highway $57.21 $35.00 $92.21 WD →
Schuyler NY building $57.21 $35.00 $92.21 WD →
Steuben NY highway $57.21 $35.00 $92.21 WD →
Wayne NY highway $57.21 $35.00 $92.21 WD →
Wayne NY heavy $57.21 $35.00 $92.21 WD →
Yates NY highway $57.21 $35.00 $92.21 WD →
Top-paying counties for OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR →