Wage determination NY20260005-16110-bld covers 84 trade classifications for building construction in Schuyler, NY. Total packages (base + fringe) range from $26.92/hr to $107.51/hr, with the highest going to ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260005-16110-bld
Revision: 2
Type: building
County: Schuyler
State: NY
Effective: May 17, 2026
Trades covered: 84
Highest rate: $107.51/hr
Official source: SAM.gov reference NY20260005View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS/INSULATOR WORKER $43.25 $27.29 $70.54 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $39.35 $33.18 $72.53 $0.00 $0.00 $0.00 $0.00
BUILDING CONSTRUCTION: BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS $33.26 $30.21 $63.47 $0.00 $0.00 $0.00 $0.00
BUILDING CONSTRUCTION: MARBLE MASON, TILE LAYERS AND TERRAZZO WORKERS $34.69 $25.76 $60.45 $0.00 $0.00 $0.00 $0.00
BUILDING CONSTRUCTION: MARBLE, TILE AND TERRAZZO FINISHERS $34.44 $20.38 $54.82 $0.00 $0.00 $0.00 $0.00
CARPENTER, BUILDING CONSTRUCTION $31.59 $23.24 $54.83 $0.00 $0.00 $0.00 $0.00
CARPENTER, HEAVY & HIGHWAY CONSTRUCTION $39.52 $27.16 $66.68 $0.00 $0.00 $0.00 $0.00
CARPENTER, HIGHWAY CONSTRUCTION $39.52 $27.16 $66.68 $0.00 $0.00 $0.00 $0.00
CARPENTER, MILLWRIGHTS & PILEDRIVERS, BUILDING CONSTRUCTION $31.59 $23.24 $54.83 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: HEAVY AND HIGHWAY CONSTRUCTION $38.63 $25.05 $63.68 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.40 $31.72 $75.12 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (SCHUYLER COUNTY) $44.50 $31.89 $76.39 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $58.44 $38.44 $96.88 $0.00 $0.00 $0.00 $0.00
GLAZIER $30.00 $31.95 $61.95 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $38.50 $25.04 $63.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRET ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN WELDER, SHEETER $37.16 $30.68 $67.84 $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: SHEETER (CHEMUNG; SCHUYLER.) $36.00 $30.80 $66.80 $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER-RIGGER, FENCE ERECTOR, PRE-CAST CONCRETE ERECTOR, REINFORCING, STONE DERRICKMAN (CHEMUNG $35.75 $30.80 $66.55 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1- (CHEMUNG AND SCHUYLER: HEAVY & HIGHWAY)..$ 33.00 22.51 LABORER GROUP 1 (CHEMUNG AND SCHUYLER: HEAVY & HIGHWAY) $33.00 $22.51 $55.51 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (CHEMUNG AND SCHUYLER: HEAVY & HIGHWAY)..$ 33.20 22.51 LABORER GROUP 2 (CHEMUNG AND SCHUYLER: HEAVY & HIGHWAY) $33.20 $22.51 $55.71 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 1 LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS SCHUYLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDE $35.56 $25.60 $61.16 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; M $35.76 $25.60 $61.36 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 3 ALL ROCK OR DRILL MACHINE OPERATORS; ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN SCHUYLER FOOTNOTE: A. PAID $35.96 $25.60 $61.56 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 4 BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS SCHUYLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL $36.16 $25.60 $61.76 $0.00 $0.00 $0.00 $0.00
LABORERS: HEAVY & HIGHWAY: GROUP 5 TOXIC WASTE REMOVAL SCHUYLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $38.76 $25.60 $64.36 $0.00 $0.00 $0.00 $0.00
NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE W $58.38 $35.75 $94.13 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 1 ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE; BLACKTOP PLANT; CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT; CHERRY $41.26 $34.85 $76.11 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY DRILL $54.68 $35.75 $90.43 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2: AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE; BACKHOE; BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT; BLAST OR ROTARY DR $57.21 $35.00 $92.21 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: ""A"" FRAME TRUCK; BALLAST REGULATOR; COMPRESSORS; COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS $54.42 $35.00 $89.42 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3: A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALLAST $51.80 $35.75 $87.55 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4: CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL D $51.41 $35.00 $86.41 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4TOWER CRANES FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRIST $61.38 $35.75 $97.13 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 7 MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CH $56.81 $35.75 $92.56 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $60.84 $35.00 $95.84 $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: MASTER MECHANIC. FOR EXCAVATION AND PAVING: FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY $43.26 $34.85 $78.11 $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $58.43 $35.00 $93.43 $0.00 $0.00 $0.00 $0.00
OVER); HEAD TOWER; HOIST; SHAFT; HOIST; HOLLAND LOADER; MAINTENANCE ENGINEER; MINE HOIST; MINING MACHINE; MUCKING MACHINE OR MOSE; OVERHEAD CRANE; PIL $55.38 $35.75 $91.13 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY B $59.88 $35.75 $95.63 $0.00 $0.00 $0.00 $0.00
PAINTERS $27.38 $23.78 $51.16 $0.00 $0.00 $0.00 $0.00
PAINTERS $28.13 $23.78 $51.91 $0.00 $0.00 $0.00 $0.00
PAINTERS $27.13 $23.78 $50.91 $0.00 $0.00 $0.00 $0.00
PAINTERS $27.44 $23.78 $51.22 $0.00 $0.00 $0.00 $0.00
PAINTERS $26.13 $23.78 $49.91 $0.00 $0.00 $0.00 $0.00
PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS; FRONT END LOADER; HI- PRESSURE BOILER; HOIST; KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTE $40.79 $34.85 $75.64 $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK $35.51 $24.57 $60.08 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE E $43.14 $35.20 $78.34 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AN $42.34 $35.20 $77.54 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ANY COMBINATION (NOT TO EXCEED THREE PIECES OF EQUIPMENT) COMPRESSORS �THREE OR LESS, OR NOT TO EXCEED 1200 CFM COM $39.64 $35.20 $74.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRIST $39.64 $35.20 $74.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES UP TO AND INCLUDING 25 TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABO $47.64 $35.20 $82.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 25-250 TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIV $49.64 $35.20 $84.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 CRANES 251 AND OVER TONS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THA $50.64 $35.20 $85.84 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA $50.14 $35.20 $85.34 $0.00 $0.00 $0.00 $0.00
PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT FOOTNOTE: A. PAID HOLIDAYS: NEW YE $40.10 $34.85 $74.95 $0.00 $0.00 $0.00 $0.00
ROOFER $30.50 $19.84 $50.34 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.94 $20.89 $56.83 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 $0.00 $0.00 $0.00 $0.00
STEAM CLEANER; TRACTOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDL $36.61 $34.85 $71.46 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 FLAT BED TRUCK; DUMP TRUCKS; STAKE BODY TRUCK; DUMPSTER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE D $25.96 $15.91 $41.87 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DUMP TRUCK; TRANSIT MIX; TRANSIT MIX; FLAT OR STAKE BODY; A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TR $26.03 $15.91 $41.94 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS; STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY $26.52 $15.91 $42.43 $0.00 $0.00 $0.00 $0.00