BLACK TOP PLANT OILER
|
$43.45 |
$34.95 |
$78.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$41.36 |
$18.90 |
$60.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER & PILEDRIVERMEN
|
$41.36 |
$18.90 |
$60.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER AND PILEDRIVER
|
$41.36 |
$18.90 |
$60.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER:MACOUPIN and MONTGOMERY COUNTIES
|
$32.15 |
$25.97 |
$58.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$39.00 |
$30.60 |
$69.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, AND ST. CLAIR COUNTIES)
|
$39.00 |
$30.60 |
$69.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (BOND, CLINTON, AND WASHINGTON COUNTIES)
|
$52.14 |
$29.14 |
$81.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (BOND, CLINTON, MACOUPIN, MADISON, MONROE, MONTGOMERY, ST. CLAIR AND WASHINGTON COUNTIES)
|
$52.41 |
$30.27 |
$82.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (CALHOUN, GREEN, JERSEY, MACOUPIN, AND MADISON COUNTIES)
|
$54.53 |
$29.46 |
$83.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (MACOUPIN, AND MONTGOMERY COUNTIES)
|
$39.80 |
$23.08 |
$62.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN (MONTGGOMERY COUNTY)
|
$41.00 |
$20.68 |
$61.68 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HOD CARRIER (ST. CLAIR COUNTY)
|
$34.14 |
$30.59 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER
|
$44.27 |
$31.65 |
$75.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, ST. CLAIR, AND WASHINGTON COUNTIES)
|
$41.65 |
$31.18 |
$72.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (GREENE, MACOUPIN, AND MONTGOMERY COUNTIES)
|
$37.60 |
$32.94 |
$70.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY)
|
$32.35 |
$32.38 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (CALHOUN COUNTY)
|
$32.84 |
$27.89 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (GREENE COUNTY)
|
$32.84 |
$27.89 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (JERSEY COUNTY)
|
$32.84 |
$27.89 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY)
|
$32.35 |
$32.38 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY)
|
$35.38 |
$29.35 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY)
|
$33.58 |
$27.30 |
$60.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY)
|
$32.85 |
$32.38 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (CALHOUN COUNTY)
|
$33.34 |
$27.89 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (GREENE COUNTY)
|
$33.34 |
$27.89 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (JERSEY COUNTY)
|
$33.34 |
$27.89 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY)
|
$35.88 |
$29.35 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS; ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER (MADISON COUNTY)
|
$32.85 |
$32.38 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY)
|
$35.08 |
$27.30 |
$62.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (CALHOUN COUNTY)
|
$34.34 |
$27.89 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (GREENE COUNTY)
|
$34.34 |
$27.89 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (JERSEY COUNTY)
|
$34.34 |
$27.89 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY)
|
$33.85 |
$32.38 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY)
|
$36.88 |
$29.35 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY)
|
$33.85 |
$32.38 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: GROUP 1 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite
|
$32.84 |
$27.89 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: GROUP 2 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite
|
$33.34 |
$27.89 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: GROUP 2 BRICK MASON AND PLASTERER TENDERS. MADISON COUNTY
|
$34.08 |
$27.30 |
$61.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: GROUP 3 :: CALHOUN COUNTY LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite
|
$34.34 |
$27.89 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER
|
$32.81 |
$31.92 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (BOND AND MONTGOMERY COUNTIES)
|
$32.41 |
$32.32 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY)
|
$29.65 |
$35.08 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES)
|
$32.84 |
$27.89 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY)
|
$31.00 |
$33.73 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY)
|
$34.14 |
$30.59 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY)
|
$33.43 |
$27.30 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY)
|
$33.58 |
$27.30 |
$60.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY)
|
$35.38 |
$29.35 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR, CLINTON, AND MADISON COUNTIES)
|
$35.38 |
$29.35 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY)
|
$34.14 |
$30.59 |
$64.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER
|
$33.31 |
$31.92 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND AND MONTGOMERY COUNTIES)
|
$32.91 |
$32.32 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY)
|
$30.15 |
$35.08 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY)
|
$31.50 |
$33.73 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY)
|
$34.64 |
$30.59 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY)
|
$33.93 |
$27.30 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY)
|
$34.08 |
$27.30 |
$61.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR, CLINTON, AND MADISON COUNTIES)
|
$35.88 |
$29.35 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR AND CLINTON COUNTIES).$ 29.76 31.47 LABORERS
|
$29.26 |
$31.47 |
$60.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY)
|
$34.64 |
$30.59 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY)
|
$35.88 |
$29.35 |
$65.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 2ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES)
|
$33.34 |
$27.89 |
$61.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE AND POWDER MAN (CLINTON COUNTY)
|
$32.50 |
$33.73 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (BOND AND MONTGOMERY COUNTIES)
|
$33.91 |
$32.32 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY)
|
$31.15 |
$35.08 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY)
|
$35.08 |
$27.30 |
$62.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY)
|
$34.93 |
$27.30 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY)
|
$36.88 |
$29.35 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR, CLINTON, AND MADISON COUNTIES)
|
$36.88 |
$29.35 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR AND CLINTON COUNTIES)
|
$30.76 |
$31.47 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY)
|
$35.64 |
$30.59 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN
|
$34.31 |
$31.92 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (BOND, CALHOUN, GREENE, JERSEY, AND MADISON COUNTIES)
|
$34.34 |
$27.89 |
$62.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY)
|
$35.64 |
$30.59 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES)
|
$42.10 |
$18.84 |
$60.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES)..$ 36.67 22.13 LINE CONSTRUCTION: EQUIPMENT OPERATOR (CALHOUN
|
$57.12 |
$28.06 |
$85.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN (MACOUPIN AND MONTGOMERY COUNTIES)
|
$38.38 |
$18.82 |
$57.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER
|
$38.18 |
$19.92 |
$58.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (MACOUPIN AND MONTGOMERY COUNTIES)
|
$56.61 |
$24.20 |
$80.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARD
|
$46.49 |
$22.33 |
$68.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (MACOUPIN AND MONTGOMERY COUNTIES)
|
$40.36 |
$19.41 |
$59.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (MACOUPIN AND MONTGOMERY COUNTIES)
|
$42.85 |
$20.14 |
$62.99 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES)
|
$42.66 |
$23.87 |
$66.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES)
|
$37.67 |
$22.42 |
$60.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHIN
|
$56.38 |
$25.23 |
$81.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON C
|
$46.03 |
$20.60 |
$66.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J
|
$52.13 |
$23.97 |
$76.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN AND MONTGOMERY COUNTIES)
|
$62.90 |
$26.06 |
$88.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN (BOND, CLINTON, GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, RANDOLPH, ST. CLAIR, AND WASHINGTON COUNTIES)
|
$64.83 |
$29.01 |
$93.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN; AND LINEMAN HOLE BORING MACHINE OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN, AND MADISON COUNTIES)
|
$66.70 |
$30.84 |
$97.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM
|
$32.45 |
$17.12 |
$49.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN
|
$35.05 |
$28.57 |
$63.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PILEDRIVERMAN:MACOUPIN and MONTGOMERY COUNTIES
|
$33.15 |
$25.97 |
$59.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC
|
$44.45 |
$34.95 |
$79.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT
|
$45.45 |
$34.95 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MAST
|
$44.45 |
$34.95 |
$79.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICE
|
$45.45 |
$34.95 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT
|
$42.45 |
$34.95 |
$77.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS
|
$41.32 |
$34.95 |
$76.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING
|
$41.32 |
$34.95 |
$76.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O
|
$36.84 |
$34.95 |
$71.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS, WATER PUMPS, REGARDLESS OF SIZE, WATER-BLASTERS, WELDING MACHINE, MIXERS, CONVEYOR, SIPHON OR JET
|
$36.84 |
$34.95 |
$71.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - CONCRETE PLANT OILE
|
$43.45 |
$34.95 |
$78.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS
|
$44.45 |
$34.95 |
$79.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WOR
|
$44.45 |
$34.95 |
$79.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT
|
$45.00 |
$34.95 |
$79.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU
|
$45.00 |
$34.95 |
$79.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT
|
$45.30 |
$34.95 |
$80.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES
|
$45.60 |
$34.95 |
$80.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER
|
$46.25 |
$34.95 |
$81.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUI
|
$46.25 |
$34.95 |
$81.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
THE CONTRACTOR OR REQUIRED BY THE OWNER
|
$46.75 |
$34.95 |
$81.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UN
|
$45.35 |
$25.72 |
$71.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2
|
$45.93 |
$25.72 |
$71.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 2 (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
|
$45.93 |
$25.72 |
$71.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3
|
$46.25 |
$25.72 |
$71.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3 (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
|
$46.25 |
$25.72 |
$71.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 3 (GREENE COUNTY)
|
$46.25 |
$25.72 |
$71.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS
|
$46.60 |
$25.72 |
$72.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE, JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES)
|
$46.60 |
$25.72 |
$72.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (GREENE COUNTY)
|
$46.60 |
$25.72 |
$72.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK
|
$47.71 |
$25.72 |
$73.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE, JERSEY, MACOUPIN, MADI
|
$47.71 |
$25.72 |
$73.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE COUNTY)
|
$47.71 |
$25.72 |
$73.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK
|
$45.93 |
$25.72 |
$71.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |