Quick Answer

Across 78 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU is $79.95/hr, with the middle 80% of counties paying between $79.95 and $79.95/hr. The highest state average is Illinois at $79.95/hr; the lowest is Illinois at $79.95/hr.

Bottom 10%
$79.95
Median
$79.95
Average
$79.95
Top 10%
$79.95

Range: $79.95 – $79.95/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$79.95/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+183.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $45.00/hr
Avg total: $79.95/hr
78 rates

All Rates

78 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alexander IL highway $45.00 $34.95 $79.95 WD →
Alexander IL heavy $45.00 $34.95 $79.95 WD →
Bond IL heavy $45.00 $34.95 $79.95 WD →
Bond IL highway $45.00 $34.95 $79.95 WD →
Calhoun IL highway $45.00 $34.95 $79.95 WD →
Calhoun IL heavy $45.00 $34.95 $79.95 WD →
Clay IL highway $45.00 $34.95 $79.95 WD →
Clay IL heavy $45.00 $34.95 $79.95 WD →
Clinton IL heavy $45.00 $34.95 $79.95 WD →
Clinton IL highway $45.00 $34.95 $79.95 WD →
Crawford IL heavy $45.00 $34.95 $79.95 WD →
Crawford IL highway $45.00 $34.95 $79.95 WD →
Edwards IL highway $45.00 $34.95 $79.95 WD →
Edwards IL heavy $45.00 $34.95 $79.95 WD →
Effingham IL highway $45.00 $34.95 $79.95 WD →
Effingham IL heavy $45.00 $34.95 $79.95 WD →
Fayette IL highway $45.00 $34.95 $79.95 WD →
Fayette IL heavy $45.00 $34.95 $79.95 WD →
Franklin IL highway $45.00 $34.95 $79.95 WD →
Franklin IL heavy $45.00 $34.95 $79.95 WD →
Gallatin IL highway $45.00 $34.95 $79.95 WD →
Gallatin IL heavy $45.00 $34.95 $79.95 WD →
Greene IL heavy $45.00 $34.95 $79.95 WD →
Greene IL highway $45.00 $34.95 $79.95 WD →
Hamilton IL heavy $45.00 $34.95 $79.95 WD →
Hamilton IL highway $45.00 $34.95 $79.95 WD →
Hardin IL highway $45.00 $34.95 $79.95 WD →
Hardin IL heavy $45.00 $34.95 $79.95 WD →
Jackson IL highway $45.00 $34.95 $79.95 WD →
Jackson IL heavy $45.00 $34.95 $79.95 WD →
Jasper IL highway $45.00 $34.95 $79.95 WD →
Jasper IL heavy $45.00 $34.95 $79.95 WD →
Jefferson IL highway $45.00 $34.95 $79.95 WD →
Jefferson IL heavy $45.00 $34.95 $79.95 WD →
Jersey IL heavy $45.00 $34.95 $79.95 WD →
Jersey IL highway $45.00 $34.95 $79.95 WD →
Johnson IL heavy $45.00 $34.95 $79.95 WD →
Johnson IL highway $45.00 $34.95 $79.95 WD →
Lawrence IL heavy $45.00 $34.95 $79.95 WD →
Lawrence IL highway $45.00 $34.95 $79.95 WD →
Macoupin IL heavy $45.00 $34.95 $79.95 WD →
Macoupin IL highway $45.00 $34.95 $79.95 WD →
Madison IL heavy $45.00 $34.95 $79.95 WD →
Madison IL highway $45.00 $34.95 $79.95 WD →
Marion IL heavy $45.00 $34.95 $79.95 WD →
Marion IL highway $45.00 $34.95 $79.95 WD →
Massac IL highway $45.00 $34.95 $79.95 WD →
Massac IL heavy $45.00 $34.95 $79.95 WD →
Monroe IL heavy $45.00 $34.95 $79.95 WD →
Monroe IL highway $45.00 $34.95 $79.95 WD →
Montgomery IL heavy $45.00 $34.95 $79.95 WD →
Montgomery IL highway $45.00 $34.95 $79.95 WD →
Perry IL heavy $45.00 $34.95 $79.95 WD →
Perry IL highway $45.00 $34.95 $79.95 WD →
Pope IL highway $45.00 $34.95 $79.95 WD →
Pope IL heavy $45.00 $34.95 $79.95 WD →
Pulaski IL highway $45.00 $34.95 $79.95 WD →
Pulaski IL heavy $45.00 $34.95 $79.95 WD →
Randolph IL heavy $45.00 $34.95 $79.95 WD →
Randolph IL highway $45.00 $34.95 $79.95 WD →
Richland IL heavy $45.00 $34.95 $79.95 WD →
Richland IL highway $45.00 $34.95 $79.95 WD →
Saline IL highway $45.00 $34.95 $79.95 WD →
Saline IL heavy $45.00 $34.95 $79.95 WD →
St Clair IL heavy $45.00 $34.95 $79.95 WD →
St Clair IL highway $45.00 $34.95 $79.95 WD →
Union IL heavy $45.00 $34.95 $79.95 WD →
Union IL highway $45.00 $34.95 $79.95 WD →
Wabash IL heavy $45.00 $34.95 $79.95 WD →
Wabash IL highway $45.00 $34.95 $79.95 WD →
Washington IL highway $45.00 $34.95 $79.95 WD →
Washington IL heavy $45.00 $34.95 $79.95 WD →
Wayne IL highway $45.00 $34.95 $79.95 WD →
Wayne IL heavy $45.00 $34.95 $79.95 WD →
White IL highway $45.00 $34.95 $79.95 WD →
White IL heavy $45.00 $34.95 $79.95 WD →
Williamson IL heavy $45.00 $34.95 $79.95 WD →
Williamson IL highway $45.00 $34.95 $79.95 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRU →