Quick Answer

Across 170 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O is $82.19/hr, with the middle 80% of counties paying between $71.79 and $82.19/hr. The highest state average is Illinois at $77.35/hr; the lowest is Illinois at $77.35/hr.

Bottom 10%
$71.79
Median
$82.19
Average
$77.35
Top 10%
$82.19

Range: $70.29 – $82.19/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$82.19/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+191.1%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $40.18/hr
Avg total: $77.35/hr
170 rates

All Rates

170 county-level rates for POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IL building $43.09 $39.10 $82.19 WD →
Alexander IL highway $36.84 $34.95 $71.79 WD →
Alexander IL building $43.09 $39.10 $82.19 WD →
Alexander IL heavy $36.84 $34.95 $71.79 WD →
Bond IL building $43.09 $39.10 $82.19 WD →
Bond IL highway $36.84 $34.95 $71.79 WD →
Bond IL heavy $36.84 $34.95 $71.79 WD →
Boone IL building $43.09 $39.10 $82.19 WD →
Brown IL building $43.09 $39.10 $82.19 WD →
Bureau IL building $43.09 $39.10 $82.19 WD →
Calhoun IL heavy $36.84 $34.95 $71.79 WD →
Calhoun IL highway $36.84 $34.95 $71.79 WD →
Calhoun IL building $43.09 $39.10 $82.19 WD →
Carroll IL building $43.09 $39.10 $82.19 WD →
Cass IL building $43.09 $39.10 $82.19 WD →
Champaign IL building $43.09 $39.10 $82.19 WD →
Christian IL building $43.09 $39.10 $82.19 WD →
Clark IL building $43.09 $39.10 $82.19 WD →
Clay IL building $43.09 $39.10 $82.19 WD →
Clay IL heavy $36.84 $34.95 $71.79 WD →
Clay IL highway $36.84 $34.95 $71.79 WD →
Clinton IL building $43.09 $39.10 $82.19 WD →
Clinton IL heavy $36.84 $34.95 $71.79 WD →
Clinton IL highway $36.84 $34.95 $71.79 WD →
Coles IL building $43.09 $39.10 $82.19 WD →
Crawford IL highway $36.84 $34.95 $71.79 WD →
Crawford IL building $43.09 $39.10 $82.19 WD →
Crawford IL heavy $36.84 $34.95 $71.79 WD →
Cumberland IL building $43.09 $39.10 $82.19 WD →
De Kalb IL building $43.09 $39.10 $82.19 WD →
De Witt IL building $43.09 $39.10 $82.19 WD →
Douglas IL building $43.09 $39.10 $82.19 WD →
Edgar IL building $43.09 $39.10 $82.19 WD →
Edwards IL building $43.09 $39.10 $82.19 WD →
Edwards IL highway $36.84 $34.95 $71.79 WD →
Edwards IL heavy $36.84 $34.95 $71.79 WD →
Effingham IL highway $36.84 $34.95 $71.79 WD →
Effingham IL heavy $36.84 $34.95 $71.79 WD →
Effingham IL building $43.09 $39.10 $82.19 WD →
Fayette IL highway $36.84 $34.95 $71.79 WD →
Fayette IL building $43.09 $39.10 $82.19 WD →
Fayette IL heavy $36.84 $34.95 $71.79 WD →
Ford IL building $43.09 $39.10 $82.19 WD →
Franklin IL heavy $36.84 $34.95 $71.79 WD →
Franklin IL building $43.09 $39.10 $82.19 WD →
Franklin IL highway $36.84 $34.95 $71.79 WD →
Fulton IL building $43.09 $39.10 $82.19 WD →
Gallatin IL heavy $36.84 $34.95 $71.79 WD →
Gallatin IL building $43.09 $39.10 $82.19 WD →
Gallatin IL highway $36.84 $34.95 $71.79 WD →
Greene IL heavy $36.84 $34.95 $71.79 WD →
Greene IL highway $36.84 $34.95 $71.79 WD →
Greene IL building $43.09 $39.10 $82.19 WD →
Hamilton IL building $43.09 $39.10 $82.19 WD →
Hamilton IL heavy $36.84 $34.95 $71.79 WD →
Hamilton IL highway $36.84 $34.95 $71.79 WD →
Hancock IL building $43.09 $39.10 $82.19 WD →
Hardin IL highway $36.84 $34.95 $71.79 WD →
Hardin IL heavy $36.84 $34.95 $71.79 WD →
Hardin IL building $43.09 $39.10 $82.19 WD →
Henderson IL building $43.09 $39.10 $82.19 WD →
Henry IL building $43.09 $39.10 $82.19 WD →
Iroquois IL building $43.09 $39.10 $82.19 WD →
Jackson IL building $43.09 $39.10 $82.19 WD →
Jackson IL highway $36.84 $34.95 $71.79 WD →
Jackson IL heavy $36.84 $34.95 $71.79 WD →
Jasper IL heavy $36.84 $34.95 $71.79 WD →
Jasper IL building $43.09 $39.10 $82.19 WD →
Jasper IL highway $36.84 $34.95 $71.79 WD →
Jefferson IL heavy $36.84 $34.95 $71.79 WD →
Jefferson IL highway $36.84 $34.95 $71.79 WD →
Jefferson IL building $43.09 $39.10 $82.19 WD →
Jersey IL heavy $36.84 $34.95 $71.79 WD →
Jersey IL highway $36.84 $34.95 $71.79 WD →
Jersey IL building $43.09 $39.10 $82.19 WD →
Jo Daviess IL building $43.09 $39.10 $82.19 WD →
Johnson IL building $43.09 $39.10 $82.19 WD →
Johnson IL heavy $36.84 $34.95 $71.79 WD →
Johnson IL highway $36.84 $34.95 $71.79 WD →
Knox IL building $43.09 $39.10 $82.19 WD →
La Salle IL building $43.09 $39.10 $82.19 WD →
Lawrence IL heavy $36.84 $34.95 $71.79 WD →
Lawrence IL highway $36.84 $34.95 $71.79 WD →
Lawrence IL building $43.09 $39.10 $82.19 WD →
Lee IL building $43.09 $39.10 $82.19 WD →
Livingston IL building $43.09 $39.10 $82.19 WD →
Logan IL building $43.09 $39.10 $82.19 WD →
Macoupin IL highway $36.84 $34.95 $71.79 WD →
Macoupin IL building $43.09 $39.10 $82.19 WD →
Macoupin IL heavy $36.84 $34.95 $71.79 WD →
Madison IL highway $36.84 $34.95 $71.79 WD →
Madison IL heavy $36.84 $34.95 $71.79 WD →
Madison IL building $43.09 $39.10 $82.19 WD →
Madison IL residential $43.09 $39.10 $82.19 WD →
Marion IL building $43.09 $39.10 $82.19 WD →
Marion IL heavy $36.84 $34.95 $71.79 WD →
Marion IL highway $36.84 $34.95 $71.79 WD →
Marshall IL building $43.09 $39.10 $82.19 WD →
Mason IL building $43.09 $39.10 $82.19 WD →
Massac IL building $43.09 $39.10 $82.19 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON O →