WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK — Prevailing Wage Rates
Davis-Bacon prevailing wages for WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKs across all covered states and counties. Rates vary by location and construction type.
Across 125 Davis-Bacon rate records nationwide, the median total package (base + fringe) for WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK is $71.65/hr, with the middle 80% of counties paying between $71.65 and $71.65/hr. The highest state average is Illinois at $71.53/hr; the lowest is Illinois at $71.53/hr.
Range: $68.10 – $71.65/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
125 county-level rates for WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCK, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Adams | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Adams | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Bond | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Bond | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Bond | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Boone | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Brown | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Brown | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Brown | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Bureau | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Calhoun | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Calhoun | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Calhoun | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Carroll | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Cass | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Cass | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Cass | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Champaign | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Champaign | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Christian | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Christian | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Clark | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Clark | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Clinton | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Clinton | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Clinton | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Coles | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Coles | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Cumberland | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Cumberland | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| De Kalb | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| De Witt | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| De Witt | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Douglas | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Douglas | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Edgar | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Edgar | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Fulton | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Greene | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Greene | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Greene | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Hancock | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Henderson | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Henry | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Jersey | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Jersey | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Jersey | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Jo Daviess | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Knox | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| La Salle | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Lee | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Livingston | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Logan | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Logan | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Logan | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Macon | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Macon | IL | residential | $43.86 | $27.56 | $71.42 | WD → |
| Macon | IL | building | $43.86 | $27.56 | $71.42 | WD → |
| Macon | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Macoupin | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Macoupin | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Macoupin | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Madison | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Madison | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Marshall | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Mason | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Mason | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Mason | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| McDonough | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| McLean | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Menard | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Menard | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Menard | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Mercer | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Monroe | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Monroe | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Monroe | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Montgomery | IL | residential | $45.93 | $25.72 | $71.65 | WD → |
| Montgomery | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Montgomery | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Montgomery | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Morgan | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Morgan | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Morgan | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Moultrie | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Moultrie | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Ogle | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Peoria | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Peoria | IL | residential | $43.83 | $24.27 | $68.10 | WD → |
| Piatt | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Piatt | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Pike | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Pike | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Pike | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Putnam | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Randolph | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Rock Island | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Sangamon | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Sangamon | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |