POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH Ps across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 51 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P is $33.87/hr, with the middle 80% of counties paying between $33.87 and $33.87/hr. The highest state average is Montana at $33.87/hr; the lowest is Montana at $33.87/hr.

Bottom 10%
$33.87
Median
$33.87
Average
$33.87
Top 10%
$33.87

Range: $33.87 – $33.87/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Montana MT
Avg base: $23.47/hr
Avg total: $33.87/hr
51 rates

All Rates

51 county-level rates for POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Beaverhead MT heavy $23.47 $10.40 $33.87 WD →
Big Horn MT heavy $23.47 $10.40 $33.87 WD →
Blaine MT heavy $23.47 $10.40 $33.87 WD →
Broadwater MT heavy $23.47 $10.40 $33.87 WD →
Carter MT heavy $23.47 $10.40 $33.87 WD →
Chouteau MT heavy $23.47 $10.40 $33.87 WD →
Custer MT heavy $23.47 $10.40 $33.87 WD →
Daniels MT heavy $23.47 $10.40 $33.87 WD →
Dawson MT heavy $23.47 $10.40 $33.87 WD →
Deer Lodge MT heavy $23.47 $10.40 $33.87 WD →
Fallon MT heavy $23.47 $10.40 $33.87 WD →
Fergus MT heavy $23.47 $10.40 $33.87 WD →
Flathead MT heavy $23.47 $10.40 $33.87 WD →
Gallatin MT heavy $23.47 $10.40 $33.87 WD →
Garfield MT heavy $23.47 $10.40 $33.87 WD →
Glacier MT heavy $23.47 $10.40 $33.87 WD →
Golden Valley MT heavy $23.47 $10.40 $33.87 WD →
Granite MT heavy $23.47 $10.40 $33.87 WD →
Hill MT heavy $23.47 $10.40 $33.87 WD →
Jefferson MT heavy $23.47 $10.40 $33.87 WD →
Judith Basin MT heavy $23.47 $10.40 $33.87 WD →
Lake MT heavy $23.47 $10.40 $33.87 WD →
Lewis And Clark MT heavy $23.47 $10.40 $33.87 WD →
Liberty MT heavy $23.47 $10.40 $33.87 WD →
Lincoln MT heavy $23.47 $10.40 $33.87 WD →
Madison MT heavy $23.47 $10.40 $33.87 WD →
McCone MT heavy $23.47 $10.40 $33.87 WD →
Meagher MT heavy $23.47 $10.40 $33.87 WD →
Mineral MT heavy $23.47 $10.40 $33.87 WD →
Musselshell MT heavy $23.47 $10.40 $33.87 WD →
Park MT heavy $23.47 $10.40 $33.87 WD →
Petroleum MT heavy $23.47 $10.40 $33.87 WD →
Phillips MT heavy $23.47 $10.40 $33.87 WD →
Pondera MT heavy $23.47 $10.40 $33.87 WD →
Powder River MT heavy $23.47 $10.40 $33.87 WD →
Powell MT heavy $23.47 $10.40 $33.87 WD →
Prairie MT heavy $23.47 $10.40 $33.87 WD →
Ravalli MT heavy $23.47 $10.40 $33.87 WD →
Richland MT heavy $23.47 $10.40 $33.87 WD →
Roosevelt MT heavy $23.47 $10.40 $33.87 WD →
Rosebud MT heavy $23.47 $10.40 $33.87 WD →
Sanders MT heavy $23.47 $10.40 $33.87 WD →
Sheridan MT heavy $23.47 $10.40 $33.87 WD →
Silver Bow MT heavy $23.47 $10.40 $33.87 WD →
Sweet Grass MT heavy $23.47 $10.40 $33.87 WD →
Teton MT heavy $23.47 $10.40 $33.87 WD →
Treasure MT heavy $23.47 $10.40 $33.87 WD →
Valley MT heavy $23.47 $10.40 $33.87 WD →
Wheatland MT heavy $23.47 $10.40 $33.87 WD →
Wibaux MT heavy $23.47 $10.40 $33.87 WD →
Yellowstone National Park MT heavy $23.47 $10.40 $33.87 WD →
Top-paying counties for POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P →