Wage Determination MT20260078-17759-hvy
Lincoln, MT · heavy · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination MT20260078-17759-hvy covers 20 trade classifications for heavy construction in Lincoln, MT. Total packages (base + fringe) range from $16.44/hr to $61.14/hr, with the highest going to IRONWORKER: REINFORCING AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260078-17759-hvy
Revision: 2
Type: heavy
County: Lincoln
State: MT
Effective: May 17, 2026
Trades covered: 20
Highest rate: $61.14/hr