Wage Determination MT20260077-17752-hvy
Teton, MT · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MT20260077-17752-hvy covers 24 trade classifications for heavy construction in Teton, MT. Total packages (base + fringe) range from $16.44/hr to $62.13/hr, with the highest going to IRONWORKER: REINFORCING AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MT20260077-17752-hvy
Revision: 1
Type: heavy
County: Teton
State: MT
Effective: May 17, 2026
Trades covered: 24
Highest rate: $62.13/hr