Wage Determination MT20260076-17740-hvy

Dawson, MT · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MT20260076-17740-hvy covers 21 trade classifications for heavy construction in Dawson, MT. Total packages (base + fringe) range from $16.44/hr to $62.13/hr, with the highest going to IRONWORKER: REINFORCING AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MT20260076-17740-hvy
Revision: 1
Type: heavy
County: Dawson
State: MT
Effective: May 17, 2026
Trades covered: 21
Highest rate: $62.13/hr
Official source: SAM.gov reference MT20260076View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $24.34 $10.40 $34.74 $0.00 $0.00 $0.00 $0.00
CARPENTER $24.30 $7.80 $32.10 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $21.13 $7.00 $28.13 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.51 $17.09 $55.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.92 $18.17 $62.09 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.14 $1.30 $16.44 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $21.10 $5.46 $26.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.53 $8.05 $31.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $23.62 $8.05 $31.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.44 $8.45 $33.89 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $24.58 $8.05 $32.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $23.00 $6.76 $29.76 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P $23.47 $10.40 $33.87 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE OILER, BULLDOZER, ROLLER, BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLIC $23.94 $10.40 $34.34 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.99 $5.09 $25.08 $0.00 $0.00 $0.00 $0.00
View all WDs for Dawson → Revision history →