Pipe Installation PLUMBER, Excludes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wage — Prevailing Wage Rates
Davis-Bacon prevailing wages for Pipe Installation PLUMBER, Excludes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wages across all covered states and counties. Rates vary by location and construction type.
Across 26 Davis-Bacon rate records nationwide, the median total package (base + fringe) for Pipe Installation PLUMBER, Excludes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wage is $82.53/hr, with the middle 80% of counties paying between $82.53 and $82.53/hr. The highest state average is Missouri at $82.53/hr; the lowest is Missouri at $82.53/hr.
Range: $82.53 – $82.53/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
26 county-level rates for Pipe Installation PLUMBER, Excludes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wage, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Audrain | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Butler | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Camden | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Carter | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Chariton | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Cooper | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Dunklin | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Howell | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Iron | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Madison | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Mississippi | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| New Madrid | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Oregon | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Pemiscot | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Perry | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Phelps | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Pulaski | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Ralls | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Reynolds | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Ripley | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Shannon | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| St Francois | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Ste Genevieve | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Stoddard | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Texas | MO | building | $52.60 | $29.93 | $82.53 | WD → |
| Wayne | MO | building | $52.60 | $29.93 | $82.53 | WD → |