Wage Determination MO20260018-15900-bld
Phelps, MO · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260018-15900-bld covers 28 trade classifications for building construction in Phelps, MO. Total packages (base + fringe) range from $24.90/hr to $82.53/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260018-15900-bld
Revision: 1
Type: building
County: Phelps
State: MO
Effective: May 17, 2026
Trades covered: 28
Highest rate: $82.53/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $27.66 | $5.88 | $33.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $44.19 | $21.85 | $66.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $40.08 | $21.85 | $61.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $29.87 | $1.47 | $31.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $21.02 | $9.49 | $30.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $26.58 | $13.15 | $39.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $30.33 | $15.30 | $45.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $32.23 | $15.30 | $47.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT | $24.90 | $0.00 | $24.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $34.90 | $17.21 | $52.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $33.90 | $17.21 | $51.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $50.66 | $23.34 | $74.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $52.60 | $29.93 | $82.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $50.66 | $23.34 | $74.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $52.60 | $29.93 | $82.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | $30.38 | $66.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.60 | $19.99 | $53.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.94 | $27.53 | $73.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.79 | $21.31 | $54.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 | $0.00 | $0.00 | $0.00 | $0.00 |