Wage Determination MO20260009-15709-bld

Chariton, MO · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MO20260009-15709-bld covers 25 trade classifications for building construction in Chariton, MO. Total packages (base + fringe) range from $19.38/hr to $82.53/hr, with the highest going to PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MO20260009-15709-bld
Revision: 2
Type: building
County: Chariton
State: MO
Effective: May 17, 2026
Trades covered: 25
Highest rate: $82.53/hr
Official source: SAM.gov reference MO20260009View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $31.51 $22.25 $53.76 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.86 $7.50 $26.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.50 $23.26 $63.76 $0.00 $0.00 $0.00 $0.00
FORM WORKER $26.44 $0.00 $26.44 $0.00 $0.00 $0.00 $0.00
GLAZIER $14.19 $5.19 $19.38 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25 $0.00 $0.00 $0.00 $0.00
LABORER $27.71 $15.50 $43.21 $0.00 $0.00 $0.00 $0.00
LABORER $29.71 $15.50 $45.21 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $23.20 $0.00 $23.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/TRACKHOE $31.12 $0.00 $31.12 $0.00 $0.00 $0.00 $0.00
PAINTER $28.56 $17.21 $45.77 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.79 $8.12 $26.91 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $50.66 $23.34 $74.00 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $52.60 $29.93 $82.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90 $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.79 $21.31 $54.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92 $0.00 $0.00 $0.00 $0.00
View all WDs for Chariton → Revision history →